background image

 

 

© Munters AB, 2018 

 

 

 

A

g/

M

IS

/U

m

G

B-

2186

-05/

14 

re

1.1

 

 

www.munters.com 

 
Australia

 Munters Pty Limited, Phone +61 2 8843 1594, 

Brazil

 Munters Brasil Industria e Comercio Ltda, Phone +55 41 3317 5050, 

Canada

 Munters Corporation 

Lansing, Phone +1 517 676 7070, 

China

 Munters Air Treatment Equipment (Beijing) Co. Ltd, Phone +86 10 80 481 121, 

Denmark

 Munters A/S, Phone +45 9862 

3311, 

India

 Munters India, Phone +91 20 3052 2520, 

Indonesia

 Munters, Phone +62 818 739 235, 

Israel

 Munters Israel Phone +972-3-920-6200, 

Italy

 Munters 

Italy S.p.A., Chiusavecchia, Phone +39 0183 52 11, 

Japan

 Munters K.K., Phone +81 3 5970 0021, 

Korea

 Munters Korea Co. Ltd., Phone +82 2 761 8701, 

Mexico

 

Munters Mexico, Phone +52 818 262 54 00,  

Singapore

 Munters Pte Ltd., Phone +65 744 6828, 

South Africa and Sub-Sahara Countries 

Munters (Pty) Ltd., Phone 

+27 11 997 2000, 

Spain

 Munters Spain S.A., Phone +34 91 640 09 02, 

Sweden

 Munters AB, Phone +46 8 626 63 00, 

Thailand 

Munters Co. Ltd., Phone +66 2 

642 2670, 

Turkey

 Munters Form Endüstri Sistemleri A.Ş, Phone +90 322 231 1338, 

USA

 Munters Corporation Lansing, Phone +1 517 676 7070, 

Vietnam

 Munters 

Vietnam,  Phone +84 8 3825 6838, 

Export & Other countries

  Munters Italy 

S.p.A., Chiusavecchia  Phone +39 0183 52 11 

Summary of Contents for RJB-4

Page 1: ...Manual for use and maintenance RJB 4 Ag MIS UmGB 2186 05 14 Rev 1 1 P N 116252 RJB 4 ...

Page 2: ...tus together with the attached technical documentation This document is destined for the user of the apparatus it may not be reproduced in whole or in part committed to computer memory as a file or delivered to third parties without the prior authorization of the assembler of the system Munters reserves the right to effect modifications to the apparatus in accordance with technical and legal devel...

Page 3: ... the RJB 4 Described below are the wiring connections between the load cells to the RJB 4 Junction Box and from the junction box to the Silo Weighing Controller RSW 2 Load cell part numbers RSLC 04 911 03 XXXXX RSLC 10 911 04 XXXXX RSLC 25 911 05 XXXXX NOTE The RSLC supports RSW 2 boards version 7 0 and above 1 Each load cell has a 4 wire shielded cable o Connect each load cell to the RJB 4 double...

Page 4: ...cond set of load cell wires into each terminal load cell block Figure 2 illustrates four load cells connected to the RJB 4 Figure 2 RJB 4 Connected to Four Silos 3 The RSW 2 cell has a 4 wire shielded cable Run these wires from the RSW 2 Silo A terminal block to the RJB 4 controller terminal block attach each wire to the input slot with same color For example connect the red wire to the red input ...

Page 5: ...RJB 4 to RSW 2 Wiring Key o 1 Silo 1 o 2 Silo 2 o 3 Place two jumpers on INT o 4 Green wire o 5 Black wire o 6 Red wire o 7 White wire NOTE There can be up to 100 meters of the supplied black gray cable between the RSW and the RJB Figure 4 illustrates a complete Platinum RJB 4 system ...

Page 6: ... Munters AB 2018 Figure 4 RJB 4 Wired to Platinum Key 1 Ground 2 Neutral USA L1 3 Phase USA L2 4 Red wire 5 White wire 6 Green wire 7 Black wire 8 Brown wire 9 Shield wire 10 Software plug ...

Page 7: ...sists of two steps 1 Use the AWG 22 cable to connect the RJB 4 to a grounding rod Figure 5 RJB 4 Connected to Grounding Rod NOTE Less than 5 ohm is considered a good ground 2 Use the AWG 14 cable to connect the silo to a grounding rod Figure 6 Grounding ...

Page 8: ...als The RJB 4 is powered via the RSW 2 or the Platinum For detailed wiring information refer to the respective manual 1 4 Scale Calibration Calibrate the RJB 4 before using the unit For detailed calibration instructions refer to the RSW 2 or Platinum manuals 1 5 Environmental Protection Recycle raw materials instead of disposing as waste The controller accessories and packaging should be sorted fo...

Page 9: ...in eight days of the discovery of the defect and within 12 months of the delivery of the defective product Munters has thirty days from the date of receipt in which to take action and has the right to examine the product at the customer s premises or at its own plant carriage cost to be borne by the customer Munters at its sole discretion has the option of replacing or repairing free of charge pro...

Page 10: ...s and consumables required for fitting and installation lubricants necessary for commissioning and maintenance It is mandatory to purchase and use only original spare parts or those recommended by the manufacturer Dismantling and assembly must be performed by qualified technicians and according to the manufacturer s instructions The use of non original spare parts or incorrect assembly exonerates ...

Page 11: ... Italy Munters Italy S p A Chiusavecchia Phone 39 0183 52 11 Japan Munters K K Phone 81 3 5970 0021 Korea Munters Korea Co Ltd Phone 82 2 761 8701 Mexico Munters Mexico Phone 52 818 262 54 00 Singapore Munters Pte Ltd Phone 65 744 6828 South Africa and Sub Sahara Countries Munters Pty Ltd Phone 27 11 997 2000 Spain Munters Spain S A Phone 34 91 640 09 02 Sweden Munters AB Phone 46 8 626 63 00 Thai...

Reviews: