3
© Munters AB, 201
8
Contents
1. General
4
1.1 Disclaimer
4
1.2 Introduction
4
1.3 Notes
4
2. Before using
5
2.1 Delivery check
6
2.2 Packaging and transport
6
2.3 Typical installations
6
3. Installation
7
3.1 Mounting the brackets
7
3.2 Assembling the bottom gutter
9
3.3 Mounting the sides
10
3.4 Assembling the top gutter
11
3.5 Inserting the drains
12
3.6 Inserting the CELdek® pads
13
3.7 Double "T" profile for Celdek® pads overlapping
14
3.8 Water distribution components
15
3.9 Plumbing kit components for the distribution pipes
17
4. Commissioning
19
4.1 First time start up
19
4.2 Setting the bleed-off rate
19
4.3 Trouble shooting
20
5. Maintenance
21
5.1 Mineral deposits
21
5.2 Algae
21
5.3 Regular maintenance
21
5.4 Replacement of a CELdek® pad
22
6. Technical specifications
23
6.1 Pump functioning
23
6.2 General
23
6.3 Water tank
24