DIMENSIONAL DRAWING
Prior to roughing in, consult with local, state, and federal codes for proper mounting height.
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
CONTEMPORARY WATER COOLERS
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
DRINKING FOUNTAINS
A152-BF4
Page 5 of 22
Revised:
02/02/18
7020-951-001
MURDOCK MFG. •
15125 Proctor Avenue • City of Industry, CA 91746 USA
Phone 800-453-7465 or 626-333-2543 • Fax 626-855-4860 • www.murdockmfg.com
Member of
30
1
4
"
31
1
8
"
16"
Finished
Floor
1
2
56
1
4
"
Installation Instructions:
A
- Provide 30-1/4" wide x 31-1/8" tall wall opening at
appropriate height. Provide structure support around
inside of the opening for frame anchoring.
B
- Carefully remove Bi-Level Mounting Frame 1 , and
panel from packaging, preventing damage.
C
- Center frame within wall opening with side, top, and
bottom lips overlapping outside the opening and up
against finished wall face. Secure to wall through
the sides, top and bottom using hardware 2 by
others ensuring 16" centerline dimension
left-to-right.
Notes:
1-Standard Bi-Level rough-ins shown. For -RBL Reverse Bi-Level, -RBL
Mounting Frame rough-ins opposite