!!
!""##"$"%"##"$"
"
STEP 16:
Attaching Metal Weight Shrouds to Main Frame
Attach all four weight shrouds to the inside of the upright tubing on the main
frame. The hardware is in the tubing already so use the bolt, split washer, and
main washer in that order to yield a firm and stable attachment of the shrouds.