!!
!""##"$"%"##"$"
"
Step 2. Assembly of the Multi-Press, Leg
Extension, and Lat/Low Row Bases
Note the positions and order of the nuts, bolts, and washers. The order of
assembly should be followed to ensure a rigid structure. Also note that there
are connecting oval tubing to the Main Tower for each side structure.