11
OPERATION INSTRUCTIONS
MAINTENANCE INSTRUCTIONS
1. Verify that sample stream supply is shut off.
2. Verify that power to the heat tracing is off.
3. Connect the heat trace tube bundle to the Pony
®
Probe Enclosure block heater.
4. Turn power on to the heat tracing.
1. Once system is operational, no routine maintenance is required.
2. Monitoring of flow and temperature values is recommended at least annually.
3. Tape the end of the wires on the Heat Trace and slide the gland with the screws over the Heat Trace followed by
the red grommet.
4. Carefully pull the wires through the seal into the Adalet enclosure leaving 1/2”-1” of white core inside the Adalet
enclosure. Remove the tape and insert the bus wires into the guide tubes of the CS-100 core sealer. MAKE SURE
THE WIRES ARE NOT CROSSED.
5. Using pin terminals, dead end the circuit into the terminal block provided.
6. NOTE: In the Pony
®
Probe Enclosure with Heater Block, you must NOT terminate until you check for polarity and
land bus wires accordingly.