Start up
page|18
INSPECTOR 900-PLUS
Soil
Target
level
visual
indicator
level
Sound
indicator
hz
10
hz
10
hz
10
hz
10
When
drilling
begins,
we
remove
the
transmitting
and
receiving
antennas,
remove
the
handle,
keep
the
radar
sensor
installed
in
the
main
unit,
carry
the
device
and
use
it
as
a
point
verification
unit,
where
we
direct
the
device
towards
the
target
directly
during
drilling
and
press
the
OK
button
for
calibration
.
Aim
and
dig
in
the
right
place
100
%
.