background image

18

Subject to modifications

  

•  19, rue de Rennes • BP 83221 • F - 35690 ACIGNÉ

15.  

TECHNICAL CHARACTERISTICS

R05N

R08N

Front linkage category

1N

1N

Lifting capacity at the end of the linkage arms* 

500 kg

800 kg

Lifting capacity with the centre of gravity of the implement positioned 610 mm 

forward of the ball ends*

300 kg

550 kg

Theoretical arm spacing

365 mm

365 mm

Height of linkage arms off the ground*
     In lowered position (1)

< 200 mm

< 200 mm

     In raised position (2)

> 450 mm

> 450 mm

Hitching hooks

-

-

Upper link length

Cat. 1 / 345 to 500 mm

Cat. 1 / 345 to 500 mm

Power take-off (PTO) with transmission shaft**

PTO output speed

2000 rpm

2000 rpm

Output shaft profile (DIN 9611)

1"3/8 - 6 splines

1"3/8 - 6 splines

Direction of rotation (viewed from tractor seat)

clockwise

clockwise

Front power take-off (PTO)**

Max. PTO power

100 hp

100 hp

PTO output speed

1000 rpm

1000 rpm

Output shaft profile (DIN 9611)

1"3/8 - 6 splines

1"3/8 - 6 splines

Direction of rotation (viewed from tractor seat)

clockwise

clockwise

* Average figures They may vary in line with tractor specifications.

** Option available dependent upon tractor - front linkage compatibility.

Summary of Contents for MX R05N

Page 1: ...FRONT LINKAGE MXR05N MXR08N User Manual Please read carefully before using MX front linkage EN 368483 AD 0919 Translation of the original manual...

Page 2: ......

Page 3: ...ts lifespan and work in complete safety The front linkage user manual before you is an important document please retain it in order to be able to refer to it if required Make it available to any other...

Page 4: ...T LINKAGE TO OPERATING POSITION 8 7 HITCHING A FRONT IMPLEMENT 10 8 UNHITCHING A FRONT IMPLEMENT 11 9 SETTING FRONT LINKAGE TO TRANSPORT POSITION 12 10 FRONT POWER TAKE OFF WITH TRANSMISSION SHAFT 14...

Page 5: ...Rennes BP 83221 F 35690 ACIGN The operator must read this manual before using the machine for the first time Familiarise yourself with Safety rules and operating requirements Hitching and unhitching a...

Page 6: ...front linkage is in proper working order and can be used in complete safety Whentravellingontheroadwithafrontimplement thefrontlinkagemustalwaysbeinaraisedpositionanditisimperativethattheregulationsg...

Page 7: ...sses on the front linkage due to leverage The more compact the implement fixing the less strain there will be on the equipment Using a compact implement also improves lifting performance This category...

Page 8: ...e front linkage Keep it readable and clean replace it if damaged 4 IDENTIFICATION PLATE The identification plate is located on the right hand side of the front linkage frame The serial number and fron...

Page 9: ...ifications 19 rue de Rennes BP 83221 F 35690 ACIGN 5 DESCRIPTION 1 Right hand arm 2 Left hand arm 3 Pin 4 Pin 5 Ram 6 Linkage frame 7 Towing clevis use a 30 mm diameter pin 8 Frame 9 3rd link bar 10 S...

Page 10: ...d surface Thetractorengineistobeturnedoffandthehandbrakeapplied 6 2 Leave the cab and remove the locking pin from the left hand arm 6 3 Hold the left hand arm and withdraw the pin Caution This operati...

Page 11: ...19 rue de Rennes BP 83221 F 35690 ACIGN 6 4 Swing the arms forwards up to the desired position 6 5 Refit the pin and secure it with the locking pin 6 6 Repeat operations 6 2 to 6 5 for the right hand...

Page 12: ...the locking catches on the hitching hooks Two possible scenarios position 1 fixed position position 2 floating position arm in floating position the implement follows the contours of the ground 7 3 Hi...

Page 13: ...front implement bracket Checks to be carried out before starting work Carry out a lift test checking that the tractor and front implement interact correctly Pay particular attention to checking the ga...

Page 14: ...lower the linkage arms to release the implement 9 SETTING FRONT LINKAGE TO TRANSPORT POSITION 9 1 Choose a level and solid surface Raise the front linkage arms Stop the engine and put on the hand bra...

Page 15: ...nes BP 83221 F 35690 ACIGN 9 2 Shut the isolator valve 9 3 Remove the locking pin while holding the left hand arm 9 4 Swing the left hand arm rearwards and refit the pin and locking pin 9 5 Repeat ope...

Page 16: ...user manual Any maintenance on the implement must be carried out with the engine shut down the implement completely at rest and hydraulically locked Each time the power take off is used grease the sl...

Page 17: ...e triangle reference B in the female triangle reference A Retighten the pin reference 3 in the triangles This acts as a lock Readjust the upper link bar if necessary 12 AUXILIARYHYDRAULICLINE This sup...

Page 18: ...ve 13 1 1 Raising and lowering the MX front linkage Move the MX monolever handle forwards or backwards 13 1 2 Operating the auxiliary hydraulic line depending on configuration Move the MX monolever ha...

Page 19: ...eaks which might have appeared and that the pins and locking pins are all fitted The frame and rams are fitted with wear bushes If there is excessive play approx 2 mm replace them with new genuine MX...

Page 20: ...2 450 mm 450 mm Hitching hooks Upper link length Cat 1 345 to 500 mm Cat 1 345 to 500 mm Power take off PTO with transmission shaft PTO output speed 2000 rpm 2000 rpm Output shaft profile DIN 9611 1 3...

Page 21: ...FU or CL or BRC or BFC or LC or CG or BP or SG or BB or PCS or LS or PG or Implement for telescopic handler loader BMSA or CGA or BTA or TR or BCA or BCDA or Feeding bucket BD1202 or BD 1402 or BD 200...

Page 22: ......

Page 23: ......

Page 24: ...19 rue de Rennes BP 83221 F 35690 ACIGN Tel 33 0 2 99 62 52 60 Fax 33 0 2 99 62 50 22 E mail contact m x eu...

Reviews: