- 37 -
D
Maintenance work may only be performed by
trained staff.
Danger!
Disconnect the mains before
starting any service work or before removing
the cover.
Grease the backgauge (
A
) control weekly with
a grease gun. Advance the backgauge as far
as possible to the front. (Use non-resinous oil
or grease).
Grease the remaining parts twice a year (see
picture).
The main switch must be on "0" (
B
).
Remove lower panel and rear wooden panel
(
C
). Tools in tool set.
• Remove any paper.
• Grease the machine.
• Check the 4 joining bolts and 2 pushing bars
for wear (
D
). If necessary inform your service
personnel.
• Mount the machine.
•
Maintenance and cleaning
•