C B S - 8 8 0 I N S T R U C T I O N M A N U A L
9
Operation Set-up
1.
Our machines are equipped with a three-prong grounded plug. Make sure the plug is well-
connected in the socket to ensure safe operation.
2.
Make sure the circuit bre
tion. (Levers pointing up)
3.
First time operation. Allow the machine to pre-heat by running at a low temperature for a few
minutes. This would apply if the machine has not been in operation for a long time. The machine
can sometimes be damp from storage or shipment and running at a low temperature will dry out any
residual moisture.
4.
Adjust the conveyor position forwards or backwards. Refer to
Figure 8
for knob adjustments. For
vertical configuration only, adjust the height of the band sealer appropriate for your bag to be sealed.
Figure 8.
(1) Adjusting Knob, (2) Foot Rest
5.
Adjust the guide to adjust seal width and position of seal line on your material.
Summary of Contents for SealerSales CBS-880I
Page 1: ...SealerSales CBS 880I Horizontal Continuous Band Sealer Right Feed Instruction Manual ...
Page 2: ...C Continuous Band Sealer Instruction Manual Distributed By Version 2 5 ...
Page 5: ...iii ...
Page 12: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 6 Getting to Know your Band Sealer ...
Page 28: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 22 ...
Page 29: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 23 Figure 34 Spare Parts Diagram Overview ...
Page 31: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 25 Figure 36 Heating Cooling Blocks ...
Page 33: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 27 Figure 38 Gears ...
Page 35: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 29 Figure 40 Conveyor Table ...
Page 38: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 32 ...
Page 39: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 33 Figure 43 Sealer Body ...
Page 43: ...C B S 8 8 0 I N S T R U C T I O N M A N U A L 37 Problem Solution abnormal replaced ...
Page 46: ...40 ...