210208_A
mychefcooking.com
8
PRODUCT MANUAL EVOLINE - DT.MP.EV.2103.2
4.
RECEPTION, TRANSPORT AND POSITIONING
Before carrying out the installation, the dimensions of the site where the equipment is to be
placed and the electrical and water connections must be verified and seen to be within the
parameters detailed in section 4.3 below.
4.1.
Reception
Once the regenerator has been received, check that the model purchased corresponds to
the order.
Check that the packaging has not been damaged during transport and that no parts of the
equipment are missing. If you detect any anomaly or problem, contact your dealer
immediately.
4.2.
Transport
The equipment should be transported in its original packaging to the closest location to the
point of installation to avoid damage as much as possible. It is recommended to keep the
original packaging until the equipment is properly installed and in operation.
To move the equipment and place it in your workspace, the following observations should
be taken into account:
-
Consider the following dimensions of the different models when passing through
narrow spaces (hallways, doors, narrow spaces:
Model
Dimensions (Width x Depth x Height) (mm)
5GN 2/3
573x660x825
5GN 1/1 Single-phase
743x661x825
5GN 1/1 Three-phase
743x723x825
6GN 1/1
773x729x890
10GN 1/1
773x729x1250
Table 3. External dimensions of the different models
-
The handling must be done with the necessary personnel to move the load of the
furniture taking into account the current occupational safety regulations at the place
of installation.
-
The regenerator must always be in an upright position during transport. It must be
lifted perpendicularly to the ground and transported parallel to it.
-
Make sure that during transport it does not tip over and is not hit by any object.