2200M4JE-HO-iS2-N_2014.04.
Chapter 5 Maintenance
Screw Compressor i-series
5.6 Reassembly
5-22
d) By following the same procedure as for the M rotor, push the F rotor into the main rotor casing. At
this moment, engage the M rotor tooth, which has stamped mark 1, between the F rotor teeth
having stamped marks 1 and 2.
Photo 020
M Rotor Assembly Photo 021
F Rotor Assembly
5.6.3 Bearing
Head
a) Screw two stud bolts symmetrically. Affix the bearing head gasket
【
31
】
to the flange surface of the
main rotor casing, and apply sufficient oil. (Photo 022)
b) While lifting bearing head
【
11
】
with lifting tools,
temporarily tighten it with the 4 bolts.
c) After driving the alignment pin in position, tighten
the bolts and remove the lifting tools.
Photo 022
Affixing Gasket Photo 023
Installing Bearing Head
5.6.4 Outer Ring of Radial Bearing
a) Attach the outer ring of the radial bearing to the main rotor casing and bearing head, in such a way
that the inner and outer rings are combined in the same manner as when they have been packaged.
b) To secure the outer ring of the bearing, mount snap rings
【
29-1
】
【
29-2
】
to the bearing head
(i160-series) or main rotor casing (i125-series).
c) Install snap ring
【
29-3
】
to the F rotor.