3.4.4. FIXING THE PILLAR BRACKET

In order to properly cut the bracket start 12 mm from the hole center, as shown in the picture I. 

Fix the motor to the bracket following the below procedure:

Linea di taglio

> 30

12 mm

pic

.L

Remove screw from plastic cap (picture L - A).

Fit the bracket to the motor (picture L).

Fit the pin (picture M).

Put the cap back and screw (picture N).

RH cap

 = RH motor 

LH cap

 = LH motor

pic

.I

pic

.M

pic

.N

NB: Be carefull when fitting the cap. It has to match the proper motor.

8

rev01_22

Summary of Contents for MYASTER 3 NEW

Page 1: ...01_22 Installation manual MYASTER NEW Automation for swing gates...

Page 2: ......

Page 3: ...3 3 3 4 Tools and materials not included Wiring Installing the operator 4 MANUAL RELEASE page 12 2 1 2 2 2 3 Technical data Operator dimensions page page page page page page page page page page page...

Page 4: ...against overcurrent Make sure the area is clear from flammable gases and or electromagnetic interferences it could lead to very dangerous injuries Switch the power and batteries OFF before any operat...

Page 5: ...00 110 22 200 3 50 40 230V 50Hz 1 7 280 8 150 2800 44 1400 120 32 250 4 00 40 3 INSTALLATION 3 1 PRELIMINARY CHECKS Before proceeding to installation it is necessary to double check the good condition...

Page 6: ...3 rev01_22 3 2 TOOLS AND MATERIALS NOT INCLUDED brick 18mm concrete 15mm inox alu tubular stainless steel PILLARS AND WALLS LEAF stainless steel alu wood 3 3 3 3 3 3 3 3 2 2 2 2...

Page 7: ...e 2006 42 CEE attachment IIA The main electric plant shall comply with the oustanding regulation and shall be state of the art carried out The power supply lines to the motors control unit and accesso...

Page 8: ...gate is particularly light fit the operator as closer as possible to gate centerline 3 4 2 PILLAR QUOTES The ideal approach is to fix the brackets complying with the measures A and B as indicated in t...

Page 9: ...opening angles without having to replace the existing ones MYASTER 6 NEW 90 D 275 250 225 200 175 150 125 100 75 A 210 240 280 275 300 300 330 370 410 B 335 330 305 310 285 290 265 240 215 Bracket 80...

Page 10: ...te opening outward picture F G H 5 mm 5 mm 5 mm 30 mm pic F pic G pic H MYASTER 3 NEW MYASTER 4 NEW MYASTER 5 NEW MYASTER 6 NEW A 115 115 115 115 B 220 200 200 200 Distance from pillar 5 5 5 5 Bracket...

Page 11: ...the bracket following the below procedure Linea di taglio 30 12 mm pic L Remove screw from plastic cap picture L A Fit the bracket to the motor picture L Fit the pin picture M Put the cap back and sc...

Page 12: ...acket in the motor and fit the pin picture Q Mount the arm of the motor onto the gate Ensure the arm is perfectly straight Check the manual opening of the leaf before definitively fixing the bracket t...

Page 13: ...e outstanding regulations ATTENTION The electric plant must be protected by a ground system in accordance to the current safety regulations Do not let the motor wire stretch during opening and closing...

Page 14: ...hown in picture V The operator is now unlocked manually open and close the gate Put the gate to closing position lock the operator turning the release key 180 clockwise Reposition the plastic cap as s...

Page 15: ...indirect damages resulting from the use or inability to use PROTECO products Any return without authorization number will be rejected The shipment of the returned product and the related costs are th...

Page 16: ...with other machinery to crate a machine under provisions of 2006 42 EC Machinery Directive It complies with the essential requirements of EEC Directives 2011 65 CE RoHS 2 2015 863 UE RoHS 3 2014 35 UE...

Page 17: ...Via Neive 77 12050 CASTAGNITO CN ITALY Tel 39 0173 210132 mygateautomation com info mygateautomation com...