background image

2.2 

TECHNICAL DATA

2.3 

OPERATOR 

DIMENSION

S

 MYASTER 3 NEW

 = 620 - 

MYASTER 4 NEW

 = 720 

MYASTER 5 NEW

 = 820 - 

MYASTER 6 NEW

 = 920

MYASTER 3 NEW 

= 940 - 

MYASTER 4 NEW 

 = 1140 

MYASTER 5 NEW

 = 1340 - 

MYASTER 6 NEW

 = 1540

159 mm

172 mm

117117  

104104  

53

53   

Motor

 24V

Motor

 230/115V

64

MYASTER 3 NEW

230V-50Hz

1,7

280

8

150°

2800

44

1400

100°

17"

350

2,00
40%

Power supply

Max. motor voltage

Rated power

Capacitor

Thermal cut off

Rated thrust

Ip rating

Revolutions

Max.opening angle

Opening time - 90°

Max. leaf weight

Max. leaf length

Duty cycle

V

A

W

µF

N

IP

rpm

deg

s

Kg

m

%

24Vdc

0,75

50

--

--

2500

44

1

7

00

100°

13,5

"

275

2,00

80%

115V-60Hz

2,3

300

30

150°

3000

44

1700

100°

14"

300

2,00

40%

230V-50Hz

1,7

280

8

150°

2800

44

1400

110°

22"

350

2,8

40%

24Vdc

0,75

50

--

--

2500

44

1

7

00

110°

18

"

250

2,50

80%

115V-60Hz

2,3

300

30

150°

3000

44

1700

110°

18"

300

2,8

40%

230V-50Hz

1,7

280

8

150°

2800

44

1400

110°

27"

250

3,50

40%

24Vdc

0,75

50

--

--

2500

44

1

7

00

110°

2

2,5

"

150

3,00

80%

115V-60Hz

2,3

300

30

150°

3000

44

1700

110°

22"

200

3,50

40%

230V-50Hz

1,7

280

8

150°

2800

44

1400

120°

32"

250

4,00

40%

3. INSTALLA

TION

3.1 

PRELIMINARY CHECKS

Before proceeding to installation, it is necessary to double check the good condition of every component 

and make sure the site is suitable for installation purposes.

All components must be integral and suitable to use.

Make sure the area around the system is clear enough to allow eazy and safe manual operation.

Make sure weight, dimensions and gate features are suitable to the model you have choosen.

Make sure the gate area is fitted with ground stops both in opening and closing.

Make sure the gate is mechanically free of friction.

Make sure the automation fixing area is compatible with the dimensions of the brackets and that there is

sufficient space to carry out manual operation easily and safely.

Make sure the automation positioning area is not subject to flooding.

Make sure the electric circuit is connected to a state of the art safety grounding.

Make sure the fixing surfaces of the photocells are flat and allow correct alignment between transmitter and

receiver.

2

rev01_22

MYASTER 4 NEW

MYASTER 5 NEW

MYASTER 6

Summary of Contents for MYASTER 3 NEW

Page 1: ...01_22 Installation manual MYASTER NEW Automation for swing gates...

Page 2: ......

Page 3: ...3 3 3 4 Tools and materials not included Wiring Installing the operator 4 MANUAL RELEASE page 12 2 1 2 2 2 3 Technical data Operator dimensions page page page page page page page page page page page...

Page 4: ...against overcurrent Make sure the area is clear from flammable gases and or electromagnetic interferences it could lead to very dangerous injuries Switch the power and batteries OFF before any operat...

Page 5: ...00 110 22 200 3 50 40 230V 50Hz 1 7 280 8 150 2800 44 1400 120 32 250 4 00 40 3 INSTALLATION 3 1 PRELIMINARY CHECKS Before proceeding to installation it is necessary to double check the good condition...

Page 6: ...3 rev01_22 3 2 TOOLS AND MATERIALS NOT INCLUDED brick 18mm concrete 15mm inox alu tubular stainless steel PILLARS AND WALLS LEAF stainless steel alu wood 3 3 3 3 3 3 3 3 2 2 2 2...

Page 7: ...e 2006 42 CEE attachment IIA The main electric plant shall comply with the oustanding regulation and shall be state of the art carried out The power supply lines to the motors control unit and accesso...

Page 8: ...gate is particularly light fit the operator as closer as possible to gate centerline 3 4 2 PILLAR QUOTES The ideal approach is to fix the brackets complying with the measures A and B as indicated in t...

Page 9: ...opening angles without having to replace the existing ones MYASTER 6 NEW 90 D 275 250 225 200 175 150 125 100 75 A 210 240 280 275 300 300 330 370 410 B 335 330 305 310 285 290 265 240 215 Bracket 80...

Page 10: ...te opening outward picture F G H 5 mm 5 mm 5 mm 30 mm pic F pic G pic H MYASTER 3 NEW MYASTER 4 NEW MYASTER 5 NEW MYASTER 6 NEW A 115 115 115 115 B 220 200 200 200 Distance from pillar 5 5 5 5 Bracket...

Page 11: ...the bracket following the below procedure Linea di taglio 30 12 mm pic L Remove screw from plastic cap picture L A Fit the bracket to the motor picture L Fit the pin picture M Put the cap back and sc...

Page 12: ...acket in the motor and fit the pin picture Q Mount the arm of the motor onto the gate Ensure the arm is perfectly straight Check the manual opening of the leaf before definitively fixing the bracket t...

Page 13: ...e outstanding regulations ATTENTION The electric plant must be protected by a ground system in accordance to the current safety regulations Do not let the motor wire stretch during opening and closing...

Page 14: ...hown in picture V The operator is now unlocked manually open and close the gate Put the gate to closing position lock the operator turning the release key 180 clockwise Reposition the plastic cap as s...

Page 15: ...indirect damages resulting from the use or inability to use PROTECO products Any return without authorization number will be rejected The shipment of the returned product and the related costs are th...

Page 16: ...with other machinery to crate a machine under provisions of 2006 42 EC Machinery Directive It complies with the essential requirements of EEC Directives 2011 65 CE RoHS 2 2015 863 UE RoHS 3 2014 35 UE...

Page 17: ...Via Neive 77 12050 CASTAGNITO CN ITALY Tel 39 0173 210132 mygateautomation com info mygateautomation com...

Reviews: