background image

Manufacturer

:

Adress

Declares that:

Product type

:

 

Model

s

:

 

CE 

COMPLIANCE DECLARATION

  

PROTECO S.r.l.

Via Neive, 77 – 12050 Castagnito (CN) – ITALIA

Electromechanical tubular motor 

PTP45 

for blinds

,

 awnings 

and according

 

accessori

es

 

corresponding to

 

PTP45 20, PTP45 30, PTP45 50, PTP45 50M

It complies with the essential requirements of the EU Directives:

2006/95/CE       

2004/108/CE 

Low Voltage Directive

Electromagnetic Compatibility Directive

It also complies, limited to the applicable parts, with the following standards

:

 

EN 55014-1

EN 55014-2

EN 60335-1: 2002+A1+A11+A12+A2+A13

EN 60335-2-97:2006+A11

EN 61000-3-2

EN 61000-3-3

We also declare that the machine is not allowed to be put into service until 

the machine has been identified and declared compliant with the 

Machinery Directive 2006/42/EC.

Castagnito, 

 

October 

1

st

 

 20

15

   

 

Marco Gallo

 

CEO

9

rev01_21

Summary of Contents for PTP45 Series

Page 1: ...PTP45 PTP45 20 PTP45 30 PTP45 50 PTP45 50M Automation for blinds and awnings Installation manual rev01_21...

Page 2: ...osing Limit switch in opening 2 4 Dimensions 3 3 3 2 1 3 2 2 SAFETY INSTRUCTIONS 3 1 3 2 Wiring Limit switch setting 4 WARRANTY 5 MAINTENANCE 6 DISPOSAL 2 2 Selection guide 7 ERROR MESSAGES 8 COMPLIAN...

Page 3: ...urrent regulations Use of the product must be restricted to its intended use Any other use is to be considered dangerous and therefore forbidden Keep any remote control device i e transmitters away fr...

Page 4: ...r Speed Motor Power Current Weight Length PTP4530 PTP4550 PTP4550M 2 2 SELECTION GUIDE Surface calculation height x width select the model according to the table below m 2 Wood and armored Steel PVC a...

Page 5: ...hout emergency release 1 2 3 4 5 6 7 PTP 45 M with emergency release 01 02 03 04 n 1 n 1 n 1 n 1 Tubular motor Limit switch adjuster wrench Split pin Wall fixing support 01 02 03 04 05 n 1 n 1 n 1 n 1...

Page 6: ...0mm 1 Low down the roller blind and disconnect it from the octagonal tubular Picture A 2 Remove the octagnal tubular Picture B RECOMMENDED TOOLS 4 3 INSTALLATION Make sure the command keys are posi on...

Page 7: ...order to check the correct posi on and to simulate the nal installa on lay temporarily the support to the wall as shown in the picture 5 Simulate the preassembled automa on respec ng the alignment be...

Page 8: ...motor at your right just switch the black wire with the brown It s always wise to double check the wiring if the rota on should not proper just switch the posi on between the black and the brown wires...

Page 9: ...ty system will remain a Proteco s property Use of the product must be restricted to its intended use Any other use shall be considered out of the warranty Installa on and maintenance are charged at th...

Page 10: ...They must thus be removed and turned into licensed rms for their disposal 8 7 ERROR MESSAGES THE MOTOR DOESN T WORKTHE MOTOR EFAULTROR CHSOLUTIONECK Double check the motor s wiringg Double check the m...

Page 11: ...of the EU Directives 2006 95 CE 2004 108 CE Low Voltage Directive Electromagnetic Compatibility Directive It also complies limited to the applicable parts with the following standards EN 55014 1 EN 55...

Reviews: