3.
AC•THOR or AC ELWA-E with SHM and battery
my-PV recommends prioritising the use of excess energy for charging the battery. Only once the
battery has finished charging AC•THOR or AC ELWA-E should start generating heat. This is achieved
by making the following setting:
Activate “Storage management via the Home Manager”
Activate “Charging of the battery prior to optional loads”
Once the battery is fully charged, AC•THOR or AC ELWA-E are only then used when no other
consumer has a higher priority!
If the excess PV power is greater than the maximum charging capacity of the battery,
generation of heat can simultaneously happen with battery charge!