AC•THOR
®
or AC ELWA
®
-E Integration into SMA Sunny Home Manager, 200305
5
Configuration - Step 2
In order for AC•THOR or AC ELWA-E to simply make use of surplus energy that can no longer be
used by other loads, my-PV recommends the following settings:
Set the priority of the load to a very low
Switch on the load depending on the proportion of PV energy
Move the “Optional energy demand” slide as required
Configuration - Step 3
These settings are displayed once more for checking.