Setting & Orientation
The myPV ClearSky should always be set on level, flat, and solid foundation that is
properly designed to support its weight and size.
The myPV ClearSky has two electrical termination cabinets that are specific to the
“Utility Side” and “Solar Side” medium voltage (MV) conduit locations.
The myPV ClearSky MUST BE ORIENTED APPROPRIATELY so the at the appropriate
electrical termination cabinet is location above the appropriate conduit.