Receiving
32
Securing
The myPV ClearSky is designed to be secured to the foundation using four (4) SS Strap
Clamps (included) and secured with one (1) SS 1/2” diameter threaded stud with nut
and washer set (4 sets total, not included).
All four (4) nuts should be tightened in accordance with the
threaded stud specification.
NOTE: Some EPCs will choose to install a bead of caulk around the perimeter of pad
mounted equipment. We encourage this as an added barrier to entry to prevent insect
entry into the cabinet, but caulking is not required.
Summary of Contents for ClearSky
Page 1: ...myPV ClearSky User Manual 1 myPV ClearSky User Manual ...
Page 12: ...Resources 12 ...
Page 14: ...Resources 14 ...
Page 19: ...Resources 19 ...
Page 20: ...Resources 20 ...
Page 48: ...Pre Energization Checks 48 Control Panel Verification Locations ...
Page 55: ...Initial Energization 55 ...
Page 63: ...Operational Testing 63 The myPV ClearSky may be left in this condition indefinitely ...
Page 68: ...Spare Parts 68 ...
Page 69: ...Spare Parts 69 ...