4
Circuit breaker ETL listed per file
4000068
Bushings & fuses rated in padmount
gear per UL file E328700
Equipment is suitable for use in
NFPA 70, NEC compliant installation
Metering and relay control panels are
UL 508a certified and labeled
Standard Features
The myPV ClearSky Interconnection product line is designed to provide a self-contained
and modularized solution for both distribution and transmission interconnected
generation facilities operating up to 35kV with a maximum continuous current of 600A
(per MV feeder).
Standard Features Included
Revenue Grade Metering Default configurations include SEL-735 metering with
revenue grade CT and PT instrumentation. Metering make/model and brand may be
modified to alternative hardware to satisfy individual customer requirements.
(Additional standard options available below)
Protection Relaying & Reclosing All configurations of the myPV ClearSky use an
SEL-751 with specific I/O and software features to support the three (3) integrated
VFI breakers. The SEL-751 shares PTs with the meter, but has dedicated protection
class CTs for appropriate fault condition monitoring. The SEL-751 may not be
modified, however a reduct relay may be added to satisfy individual customer
requirements. (Additional standard options available below)
myPV IQ™ - Remote Operator Interface All configurations of the myPV ClearSky
products arrive with a cellular modem and browser-based HMI pre-installed. The
cellular modem is enabled with a temporary data plan to support remote access to
the metering and relay devices during initial startup and commissioning activities.
The cellular service can be disabled or re-enabled to suit both security requirements
and warranty support during the warranty period. Additionally, the myPV IQ™ -
Summary of Contents for ClearSky
Page 1: ...myPV ClearSky User Manual 1 myPV ClearSky User Manual ...
Page 12: ...Resources 12 ...
Page 14: ...Resources 14 ...
Page 19: ...Resources 19 ...
Page 20: ...Resources 20 ...
Page 48: ...Pre Energization Checks 48 Control Panel Verification Locations ...
Page 55: ...Initial Energization 55 ...
Page 63: ...Operational Testing 63 The myPV ClearSky may be left in this condition indefinitely ...
Page 68: ...Spare Parts 68 ...
Page 69: ...Spare Parts 69 ...