- 7 -
ASSEMBLY PROCEDURES
STEP 1
1-1. Put the 3 pcs post brackets on each position on the base as
shown in the picture.
1-2. Use 3 Medium Bolts(M8x16) to join the post brackets and stand.
STEP 2
2-1. Put the post on the top of 3 pcs post brackets.
2-2. Use 6 Large Bolts and Flange Nuts (M6) to connect the post to the
3 pcs post brackets. Tighten the bolts and nuts.
STEP 3
Place the tank housing on the stand.
Bolt
Post
STEP 2
Nut
Tank housing
STEP 3
Bolt
Stand
Square metal
support
STEP 1