background image

Rev. 7-29-15 

Part #15-9324

www.NabcoEntrances.com 

1400 Folding Door System w/Opus Control

Install the Door Panel 

6-24

3. Adjust Door Panels so the gaps around the Top, Bottom, and Sides are parallel to the Jamb 

Tubes, Header, and Threshold.

a.  Adjustments can be done using the Top Pivot Bracket and Bottom Pivot Bearing.

4. Tighten down the (4) 1/4-20 x 3/4 inch Hex Head screws and (4) 1/4 inch Star Washers. 

Figure

4-8

 Square Fold Door Panels

DN 0976

Gap

Gap

Gap

5. Push on the Bar located in the middle of Bi-Fold Panels to manually fold open the Door. 

6. Go to the Spindle Drive Bar located inside the Top Web, at the Pivot end. 

7. Obtain (1) Split Plastic Bushing that was provided by NABCO. 

8. Push the Split Plastic Bushing around the Spindle between the Guide Channel and Spindle 

Drive Bar.

Figure

4-9

 Push Split Plastic Bushing around the Spindle

DN 0850

Split Plas c Bushing

Spindle

Guide Channel

Spindle Drive Bar

Summary of Contents for GT-1400

Page 1: ...utoma c Door if a Safety System is not working Instruct the Owner to keep all power turned OFF un l correc ve ac on can be achieved by a NABCO trained technician Failure to follow these prac ces may r...

Page 2: ...t 2 7 Sec on 2g Associated Manuals Part Numbers 2 7 CHAPTER 3 INSTALL THE DOOR FRAME 3 8 Sec on 3a Prepare the Rough Opening 3 8 Sec on 3b Remove Dress Plates from Header 3 8 Sec on 3c Secure Header t...

Page 3: ...Rev 11 26 14 Part 15 9324 www NabcoEntrances com 1400 Fold Door System ii CHAPTER 6 INSTALL THE DOOR PANEL 6 21 CHAPTER 7 TROUBLESHOOTING 7 25...

Page 4: ...t be considered for property damage unless personal injury risk is present Indicates a hazardous situa on which has some probability of severe injury It should not be considered for property damage un...

Page 5: ...fied technician to teach you how to use the door No ce This manual and the owner s manual must be given to and retained by the purchasing facility or end user No ce Advise the purchasing facility or e...

Page 6: ...rd The GT 1400 is listed with the Underwriters Laboratory and is identi ied as such on the label Instruct the building owners and operator on the essentials of the operation of the door and this devic...

Page 7: ...slide apart from the center FS FX FX FS FS Swing Panel FX Slide Panel Extrusion Con igurations Slick Jamb Tubes Emergency Egress Full Open Door Panel assembly breaks out for emergency egress Sec on 2a...

Page 8: ...tain whether power supply is disconnected always verify using a voltmeter Notice Wiring must meet all local state federal or other governing agency codes Sec on 2e Magnum 4A Control The Magnum 4A Cont...

Page 9: ...each side Figure 3 1 Rough Opening R O WIDTH R O HEIGHT 90 0 90 0 1 4 1 4 1 4 FINISHED FLOOR DN 0081 Sec on 3b Remove Dress Plates from Header 1 Remove Header from Carton 2 Position Header so the Mag...

Page 10: ...n 6 Carefully lower the Dress Plate until the Rocker Switch wiring is exposed 7 Disconnect the Switch from the switch harness 8 Remove the Dress Plate and Lock Plates a Save hardware for reinstallatio...

Page 11: ...Exterior opening EXTERIOR Door Opening Weathering must face up towards Exterior opening 4 Use a 7 16 inch Socket on a 6 inch extension to secure the Header to each Jamb Tube with 4 1 4 20 x 3 4 inch b...

Page 12: ...e 3 7 a Shim back of Jamb as required 7 Plumb the Header at the top to ensure the rough opening allows a 1 4 inch clearance a Shim top of Header or Transom Horizontal as required Figure 3 7 Shim and P...

Page 13: ...drop out of the Access Hole at any time during installation The Guide Channel will spring back to its original location and can result in personal injury or damage Figure 3 10 Insert Pin or 1 8 inch...

Page 14: ...degree open position secure Header to the rough opening Standard Fold Door Use 1 4 inch diameter anchors with a maximum 48 inches on center First anchor maximum is 36 inches from each end of the Heade...

Page 15: ...eath 1 Disconnect Power at Fused disconnect Verify with voltmeter 2 Route wiring away from moving parts and other low voltage wiring Note Wire clamps are factory installed installed the Header to secu...

Page 16: ...OSE STOP OPEN BCHK CURRENT LIMIT R28 LED SIGNAL INPUT CAPACITOR C26 D10 AUX F1 PWR J2 AC IN MAGNUM 4A TRANSFORMER RELAY RELAY J4 J5 MOTOR J1 R2 R3 R4 R5 R6 R7 R8 O F F 1 2 4 3 SW2 SW1 TDAST DPG LCHK C...

Page 17: ...into the loor 6 Remove the Bottom Pivot Floor Portion 7 Insert 1 1 inch Anchor into each drilled hole Please see Figure 5 2 8 Replace Bottom Pivot Align screw holes with Anchors 9 Secure Bottom Pivot...

Page 18: ...rted into the Lovejoy Coupling Access Hole If not please follow instructions listed in Section 3d Steps 3 thru 4 2 Go to the Spindle Drive Bar Remove the Hex Bolt and Nut Please see Figure 5 4 a Pleas...

Page 19: ...de the Bottom Rail 6 Go back to the Top Web Lower the Spindle Drive Bar until it butts up against the Web 7 Secure the Spindle Drive Bar to the Web with 4 1 4 20 x 3 4 inch Hex Head Screws and 4 1 4 i...

Page 20: ...trike Jamb Tube are parallel to each other and gap between Bi Fold Doors are parallel to each other Please see Figure 5 8 5 It is important for all gaps to be parallel to each other Move the Strike en...

Page 21: ...justments may be necessary 1 Go to the Push Rod that needs to be adjusted Loosen both Hex Locknuts a One Hex Locknut has left hand threads the other Hex Locknut has right hand threads 2 Turn the Push...

Page 22: ...es into the loor 6 Insert 1 1 inch Anchor into each drilled hole 7 Obtain the Pivot Base Bracket from the Parts Box 8 With the open end pointing to Jamb Tube align screw holes with the Bottom Pivot Th...

Page 23: ...hipping Sticker located on the Spindle Drive Bar 3 Release the Spindle Drive Bar from the Guide Channel a The Spindle Drive Bar can be pushed up toward the Header or down into the Top Web of the Foldi...

Page 24: ...Hex Head Screws and 4 1 4 inch Star Washers that were saved for reinstallation a Do not tighten down bolts at this time Bolts need to be loose enough to allow the Folding Door to be adjusted Figure 4...

Page 25: ...h Hex Head screws and 4 1 4 inch Star Washers Figure 4 8 Square Fold Door Panels DN 0976 Gap Gap Gap 5 Push on the Bar located in the middle of Bi Fold Panels to manually fold open the Door 6 Go to th...

Page 26: ...from Terminals 1 and 2 and install an alternate power supply such as a Transformer Cause Motor may be blown Resolu on Replace motor Cause Safety circuit is ac vated Resolu on Check to ensure Dip Swit...

Page 27: ...o Back Check Cause Back Check switch may not be closing at correct posi on Resolu on Pre load operator by correctly installing arm on operator spindle per Hardware Installa on manuals Door does not st...

Page 28: ...on 1 Rewire Safety Sensor to Con nuous Safety 2 Go to Terminal Block 3 Connect output of the Sensor to Terminal 5 Red Wire and Terminal 3 Violet Wire Sensor shows ac va on signal Cause Sensor not prop...

Reviews: