GT 710-8710 Swing Door System Low Energy Operator
Part #15-10683
Rev. 9-24-14
5-14
Install the First Half of Swing Arm
DN 1117
Rod End
Threaded Rod
Swing Arm
Nut
Threaded Rod
Arm Shoe
Figure 5-3
Disassemble the Outswing Arm
2.►
Go to
to locate the appropriate length measurement for the Threaded Arm.
Table 5-2
Dimension “B” Rod Length
Rod
Rod
Rod
Rod
Rod
Reveal
Length
Reveal
Length
Reveal
Length
Reveal
Length
Reveal
Length
0”
16-5/8”
3-1/4”
19-1/8”
6-1/2”
21-3/4”
9-3/4”
24-5/8”
13
27-1/2”
1/4”
16-13/16”
3-1/2”
19-5/16”
6-3/4”
22”
10
24-13/16”
13-1/4”
27-3/4”
1/2”
17”
3-3/4”
19-1/2”
7”
22-3/16”
10-1/4”
25”
13-1/2”
28”
3/4”
17-3/16”
4”
19-11/16”
7-1/4”
22-7/16”
10-1/2”
25-1/4”
13-3/4”
28-3/16”
1”
17-3/8”
4-1/4”
19-7/8”
7-1/2”
22-5/8”
10-3/4”
25-1/2”
14
28-7/16”
1-1/4”
17-9/16”
4-1/2”
20-1/8”
7-3/4”
22-7/8”
11
25-3/4”
14-1/4”
28-5/8”
1-1/2”
17-3/4”
4-3/4”
20-5/16”
8”
23”
11-1/4”
25-15/16”
14-1/2”
28-7/8”
1-3/4”
17-15/16”
5”
20-1/2”
8-1/4”
23-1/4”
11-1/2”
26-3/16”
14-3/4”
29-1/8”
2”
18-1/8”
5-1/4”
20-3/4”
8-1/2”
23-1/2”
11-3/4”
26-3/8”
15
29-3/8”
2-1/4”
18-5/16”
5-1/2”
20-15/16”
8-3/4”
23-3/4”
12
26-5/8”
15-1/4”
29-9/16”
2-1/2”
18-1/2”
5-3/4”
21-1/8”
9”
24”
12-1/4”
26-13/16”
15-1/2”
29-13/16”
2-3/4”
18-11/16”
6”
21-3/8”
9-1/4”
24-3/16”
12-1/2”
27-1/16”
15-3/4”
30”
3”
18-7/8”
6-1/4”
21-9/16”
9-1/2”
24-3/8”
12-3/4”
27-5/16”
16
30-1/4”
3.►
Measure the Threaded Rod between the center of each Eye, located on each Link, located at each end
of the Rod. Please see Dim B in
4.►
Remove the Link that is not attached to the Arm Shoe, from the Threaded Rod. Please see
5.►
Cut the Threaded Rod according to the measurement that was determined in Step 3.
DN 1114
Face of Swing Door
Dim. B
Back of Header
Reveal =
Arm
Link
Eye
Link
Figure 5-4
Measure the Threaded Rod Length
6.►
Obtain (1) color coordinated Plastic Tube from the Outswing Rod assembly. Please see
.