7 of 26
www.NabcoEntrances.com
GT 710-8710 OPUS Low Energy Swing Doors Quick Set-Up and Parts Guide
Rev 12-20-17
P/N C-00178
6. Secure the Shim to stud(s). It is recommended to use Lag Bolts.
Header
Shim
Wall
Top of Door Frame
Swing Door
GT 710 SIDE LOAD SWING DOOR
GT 8710 SIDE LOAD SWING DOOR
Header
Shim
Wall
Top of Door Frame
Swing Door
DN 1080
Figure 7
Shim between Conversion Unit and Wall
SECTION 4 .4: Secure the Header to the Door Frame
1. Lift up the Header. Insert Power Wiring through the 7/8 inch hole located at the left or right side of Header End Cap.
2. Flush Header to the Pivot Door Jamb and then line up the screw holes.
3. Secure the Header to the Door Frame. It is recommended to use 1/4-20” Hex Head Bolts, or Lag Bolts or Wood Screws.
DN 1132
1/4” Screw holes
Flush Header to
Pivot Door Jamb
(or 1-3/4” Ver cal Line)
ON
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Figure 8
Secure Header to Door Frame
SECTION 4 .5: Ensure Proper Spindle Location
Attention: Adjustments to the location of Motor/Operator must be made if the distance between the “center of
spindle” and “edge of Jamb Tube” is different from the measurement shown within this section .
4 .5 .1 Outswing Butt Hinge
DN 1932
6-1/2”
Bu Hinge
Outswing
1-3/4”
Header
Overlap
ON
14
13
12
11
10
9
8
7
6
5
4
3
2
1