17 of 26
www.NabcoEntrances.com
GT 710-8710 OPUS Low Energy Swing Doors Quick Set-Up and Parts Guide
Rev 12-20-17
P/N C-00178
CHAPTER 9: 120 VAC GENERAL WIRING
Shut the installation site branch Circuit Breaker OFF. Failure to do so may result in serious
personal or fatal injury. When uncertain whether power supply is disconnected, always
verify using a voltmeter.
All high voltage electrical connections must be made by licensed electricians according to
National and Local electrical codes/regulations.
Permanent wiring shall be employed as required by local codes.
Electrical circuit to Nabco operator must not be not shared with other equipment such
as lighting, cash registers, or any device that might cause electrical interference on the
circuit.
Keep sufficient spacing between high-voltage and low-voltage wiring. 120 VAC Power
wires must be routed (separate from other wiring) located near the top of inside Header.
Ensure that incomming electrical ground is properly secured to the grounding screw or
grounding wire, whichever is provided.
Attention: Insert all Incoming 120 VAC Power wires into the pre drilled Electric Service Access Hole located at the
left or right side of Header End Cap .
Note: It is recommended for the Installer to house all Incoming 120 VAC wires within an Electrical Conduit.
DN 1335
SINGLE
120 VAC
SIMULTANEOUS PAIR
120 VAC
WHITE
BLACK
NEUTRAL
HOT
GROUND
OPUS CONTROL
BLACK
BLACK
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Ground Screw
ON/OFF
Rocker
Switch
WHITE
BLACK
NEUTRAL
HOT
GROUND
OPUS CONTROL
BLACK
BLACK
OPUS CONTROL
BLACK
WHITE
GREEN
GREEN
14
13
12
11
10
9
8
7
6
5
4
3
2
1
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Ground Screw
ON/OFF
Rocker
Switch
Motor
2
1
Motor
BLACK
2
1
Motor
2
1
WARNING
WARNING
CAUTION
CAUTION
CAUTION
CAUTION