background image

 

24 of 31

 

GT1175 Slide Door Opus Control Wiring and Programming Manual 

www.NabcoEntrances.com

P/N C-00391 

Rev 8-11-21

SECTION 11.6: Factory Wiring for using Acusensor M for Sidelite Safety

I/O T

erminal 8-14

I/O T

erminal 1-7

1 2 3 4 5 6 7

8 9 1011121314

BR

OW

N

RED

BLK/WHITE YEL

LO

W

BR

OW

N, GREY

BLK/WHITE

YELL

OW

RED

, GREEN, BL

UE

Acusensor M Harness P/

N A-01292

BN

B/W

Y

RD

SIDELITE

PR

OT

EC

TION

HARNESS

P/

N A-01192

ACUSENSOR 

M

P/

V-

00741

NO

TES:

ON AN 1175, “INPUT SW

L”

 IS SET 

TO

 “SL

OW

 OPEN” 

BY

 DE

FA

UL

T.

IN THIS CASE THE DOOR WILL OPEN SL

OW

LY

 WHEN ACTI

VA

TED DURING SIDELITE DETE

CTION.

IF “INPUT SW

L”

 IS SET 

TO

 “CONTINUOUS SAFETY

”, DOOR WILL NO

T OPEN IF SIDELITE

DETE

CTION OCCU

RS

 BEFORE ACTI

VA

TION

.

IF ACTI

VA

TION OCCU

RS

 FI

RS

T, THEN SIDELITE DETE

CTION OCCU

RS

. THE DOOR

S WILL CONTINUE

 

TO

 OPEN 

AT

 NORMAL SPEED

.

“SWL MONI

TO

RING” SHOULD BE SET 

TO

 “A

CTIVE” WHEN SIDELITE PR

ES

ENCE IS USED

.

BN

BK

Y

RD

Acusensor Ex

te

nsio

n

Harness

P/

N M-01168  24”

P/

N M-01156  48”

BN

BK

Y

RD

BN

BK

Y

RD

Acusensor Y-

Harness

P/

N A-01140 (Bi-P

art)

DN 2284

Summary of Contents for GYRO TECH GT-1175

Page 1: ...into the myNABCO portal 4 SECTION 2 4 QR Code Links 4 CHAPTER 3 GETTING STARTED 4 SECTION 3 1 Features 4 SECTION 3 2 Wiring 5 SECTION 3 3 General Specifications 5 SECTION 3 4 Electrical Specifications...

Page 2: ...LIDE DOOR WIRING DIAGRAMS 19 SECTION 11 1 Single Slide Door with Acusensor M and Holding Beam w monitoring 19 SECTION 11 2 Telescopic Slide Door with Acusensor M and Holding Beam w monitoring 20 SECTI...

Page 3: ...t all power to the junction box prior to making any electrical connections Failure to do so may result in serious personal or fatal injury When uncertain whether power supply is disconnected always ve...

Page 4: ...ting sliding doors using U01 U19 controls Contact Customer Service at 1 888 679 3319 to purchase Retrofit kits SECTION 2 3 Request a User Name Password to gain access into the myNABCO portal To gain a...

Page 5: ...O factory utilizes Underwriters Laboratories UL recognized component wire terminals and connector housings to manufacture all Automatic Door systems Table 1 Power Draw Common Accessories Sensor Part N...

Page 6: ...2 clicks to advance through each menu item Clockwise To scroll forward through screens and programming options Counterclockwise To scroll backward through screens and programming options DN 2429 Type...

Page 7: ...Range Open Timer Reac on Power Open Recycle Sens Close Recycle Sens A er Open Recycle Op onal Se ng Hold Close Force Power Close Range Manual Open Func on Manual Open Sens Manual Open Timer BCHK Lock...

Page 8: ...ions Displays the current status of all of the Input Output lines of the terminal strip SECTION 4 2 Level Two Access Screen Note The Activate Passcode option is only displayed in the event 0045 had no...

Page 9: ...g History Data LEVEL 3 Low Energy or Full Low Full Rotate Dial LEVEL 4 LEVEL 2 Long Push Long Push CHAPTER 5 STROKE LEARNING DN 2314 11 20 10 12 Type 1 GT1175 Opus Slide Status Slow Closing Error Ac v...

Page 10: ...at the top Opus Controls are labeled Type 1 or Type 2 Type 1 should be considered the Slave Control Type 2 should be considered the Master Control X All Activation Devices and main harness are connect...

Page 11: ...ta SimPair Yes No 11 20 10 12 Type 2 GT1175 Opus Slide Status Fully Closed Error Ac va on IN EXT Posi on Other BA 6B SWL Push and Hold Dial Go to Se ng Mode Figure 8 Reset Control 2 Turn the Rotary Di...

Page 12: ...d ATTENTION Bi Parts are set up as Left Hand Left Right Left From the Exterior Side of Building determine which Handing to enter Left or Right RIGHT HANDING DN 1326 LEFT HANDING EXTERIOR SIDE OF BUILD...

Page 13: ...ormal Sim Pair If selected before returning to last screen option to copy settings to other Control is given Double Egress The Activation signal only is shared between doors All other signals are inde...

Page 14: ...nality N C Air lock Set for Air lock functionality Breakout Pass through Output closes when breakout occurs TrmnL H PassThrough Output changes state when input H changes state Door Sequencing Provisio...

Page 15: ...ds door in open position Asia Only Do Not Use ANSI does not allow Activation Sensor to be mounted on the swing side of door If activated Opus will ignore the Activation Sensor while d oor is moving Th...

Page 16: ...ettings are OFF by default except when used as 1175 Opus Slide in which case standard settings have monitoring enabled SECTION 8 6 History Setting History Data Parameter Description Operation Cnt Indi...

Page 17: ...justment 11 20 10 12 Short Push Rotary Dial SECTION 9 2 Recycle Count Reset Opera on Cnt 0 cnt Open Recycle Cnt 0 cnt Close Recycle Cnt 0 cnt Latest Rcycl Posi on C1 0 Op 0 Clear Recycle Cnt 0 If you...

Page 18: ...eep sufficient spacing between high voltage and low voltage wiring 120 VAC Power wires must be routed separate from other wiring located near the top of inside Header Ensure that incomming electrical...

Page 19: ...40 P N M 01070 15 Breakout Jumper P N A 00385 BROWN GREY BLACK WHITE YELLOW RED GREEN BLUE ACUSENSOR M HARNESS P N A 01292 INTERIOR ACUSENSOR M P N V 00741 EXTERIOR ACUSENSOR M P N V 00741 OPTEX Hold...

Page 20: ...eakout Jumper P N A 00385 BROWN GREY BLACK WHITE YELLOW RED GREEN BLUE ACUSENSOR M HARNESS P N A 01292 INTERIOR ACUSENSOR M P N V 00741 EXTERIOR ACUSENSOR M P N V 00741 OPTEX Holding Beam Controller P...

Page 21: ...at the NABCO Factory Check to ensure both Opus Controls are programmed Under Op onal Se ngs Sim Pair Se ng is set to Normal Sim Pair For each Opus Control perform Stroke Learn Opus Control Types Type...

Page 22: ...Terminal 3 4 Breakout connector is removed from main harness and blue wires are connected diretly to the breakout beam control OTHER WIRING NOT SHOWN FOR SIMPLICITY BLUE GREEN ORANGE ORG WHT RED BROW...

Page 23: ...P N M 02043 Breakout Switch P N A 00758 Full Open P N A 00387 Fixed Sidelite BN BK Y RD Rocker Switch Extension 36 P N A 00967 BN BK Y RD Sensor 12 VD Ac va on Monitoring Common Control Main Harness B...

Page 24: ...N A 01192 ACUSENSOR M P N V 00741 NOTES ON AN 1175 INPUT SWL IS SET TO SLOW OPEN BY DEFAULT IN THIS CASE THE DOOR WILL OPEN SLOWLY WHEN ACTIVATED DURING SIDELITE DETECTION IF INPUT SWL IS SET TO CONT...

Page 25: ...RELAY OUTPUT 3 ELECTRIC STRIKE LOCK OUTPUT TIMER 1 5 1 5 seconds OPUS Assembly Single P N A 01418 Telescopic P N A 01420 GREEN Ground Power Switch OPUS Power Connector 1175 OPUS Electric Lock Harness...

Page 26: ...TPUT TIMER 1 5 1 5 seconds BLACK Hot WHITE Neutral GREEN Ground OPUS Power Connector WHITE WHITE BLACK BLACK 1175 OPUS Electric Lock Harness Set P N M 02044 Power Supply P N V 00022 Magne c Lock GREEN...

Page 27: ...r Switches with Key Switches 1 Replace the Rocker Switch with the Key Switch 2 Keep the Key Switch in 2 Way 3 Connect the Remote Switch to the Opus Control Terminals 11 and 14 for 1 Way Terminals 12 a...

Page 28: ...CONTROLLER P N A 00129 Terminal 6 Terminal 1 Power Power Signal Signal Monitor Monitor SET TO MODE B 2 FLASHES 1 2 3 4 6 5 7 8 9 10 12 11 13 14 Optex OS 12C T Controller Terminal 7 Terminal 14 HOLDIN...

Page 29: ...gnal to the door control to hold the door open until the threshold is clear and the beam is restored DN 1879 SINGLE SLIDE DOOR BI PART SLIDE DOOR Emit Rcvr Emit Rcvr Floor 21 inches 54 inches Floor 21...

Page 30: ...atus should now show Fully Closed Must navigate back to the main screen as shown at right for an activation signal to work Hard to manually open door Software Revision up to and including 18 Re enter...

Page 31: ...and adjust the recycle sensitivity and Open Close speed No Load No load error Check operator gear cracked belt skipped Electrical Lock Electrical lock error Check lock settings and wiring Ensure lock...

Reviews: