文件编号:
NDT2920129
文件版本:
2
地址:上海市浦东新区申江南路
2000
号
邮编:
201315
电话:
(021)68586699
传真:
(021)23025796
第
15
页
共
20
页
图
/Diagram 7-4
注
:P1-P4
为引出线端子
Note
:
P1-P4 is lead-out wire terminal
8.5 手动操作机构 Manual operating mechanism
①
安装前,安装操作手柄的开关柜门按图开好孔,开孔中心离铰链距离大于 200 mm
Before installation, a switch cabinet door for installing operating handle is holed in accordance
with the diagram. Distance between the holed part and the hinge is greater than 200 mm.
安装
A
型手柄门板开孔尺寸
Holing size of type A handle door panel
安装 F 型手柄门板开孔尺寸 Holing size of type A handle door panel
图/Diagram7-5
② 把已在面盖上固定好操作机构的断路器安置于安装板上,并稍作固定。
The breaker with an operating mechanism fixed on cover is installed on the installation panel
and slightly fixed then.
③
把操纵杆方轴固定于操作机构上安置方轴的方孔内。
The square shaft of an operating rod is fixed in a square hole on the operating mechanism.
④ 关上开好孔的门板,调整断路器的位置,使方轴中心与手柄开孔中心一致。