FP0 Hardware
Installation
8-2
Matsushita Electric Works (Europe) AG
8.1
Important Notes
Please, read the following notes carefully before installing your FP0.
Notes
Avoid installing the unit in the following locations:
– Ambient temperatures outside the range of 0
°
C to
55
°
C/32
°
F to 131
°
F
– Ambient humidity outside the range of 30% to 85% RH
– Sudden temperature changes causing condensation
– Inflammable or corrosive gases
– Excessive airborne dust or metal particles
– Benzine, paint thinner, alcohol or other organic
solvents or strong alkaline solutions such as
ammonia or caustic soda
– Excessive vibration or shock
– Direct sunlight
– Water in any form including spray or mist
Avoid noise interference from the following items:
– Influence from power transmission lines, high voltage
equipment, power cables, power equipment, radio
transmitters, or any other equipment that would
generate high switching surges
– If noise occurs in the power supply line even after the
above countermeasures are taken, it is recommended
to supply power through an insolated transformer,
noise filter, or the like
.
Measures regarding heat discharge
– Always install the unit orientated with the tool port
facing outward on the bottom in order to prevent the
generation of heat.
Tool port
Summary of Contents for FP Series
Page 12: ...Chapter 1 Overview...
Page 21: ...FP0 Hardware Overview 1 10 Matsushita Electric Works Europe AG...
Page 22: ...Chapter 2 Control Units...
Page 44: ...Chapter 3 Expansion I O Units...
Page 67: ...FP0 Hardware Expansion I O Units 3 24 Matsushita Electric Works Europe AG...
Page 68: ...Chapter 4 Analog I O Unit...
Page 87: ...FP0 Hardware Analog I O Unit 4 20 Matsushita Electric Works Europe AG...
Page 88: ...Chapter 5 FP0 I O Link Unit MEWNET F...
Page 102: ...Chapter 6 Power Supply Unit...
Page 105: ...FP0 Hardware Power Supply Unit 6 4 Matsushita Electric Works Europe AG...
Page 106: ...Chapter 7 I O Allocation...
Page 112: ...Chapter 8 Installation...
Page 122: ...Chapter 9 Wiring...
Page 139: ...FP0 Hardware Wiring 9 18 Matsushita Electric Works Europe AG...
Page 140: ...Chapter 10 Trial Operation...
Page 143: ...FP0 Hardware Trial Operation 10 4 Matsushita Electric Works Europe AG...
Page 144: ...Chapter 11 Self Diagnostic and Troubleshooting...
Page 156: ...Appendix A System Registers...
Page 170: ...Appendix B Special Internal Relays...
Page 174: ...Appendix C Special Data Registers...
Page 183: ...FP0 Hardware Special Data Registers C 10 Matsushita Electric Works Europe AG...
Page 184: ...Appendix D Dimensions...
Page 195: ...FP0 Hardware Dimensions D 12 Matsushita Electric Works Europe AG...