FP0 Hardware
FP0 I/O Link Unit (MEWNET–F)
5-10
Matsushita Electric Works (Europe) AG
Using the serial connector, the FP0 I/O Link Unit works as the slave station of the
Remote I/O System. The FP0 I/O Link Unit exchanges I/O information with the
FP3/FP10SH. Use a two–conductor cable to connect the FP3/FP10SH and the FP0 I/O
Link Unit. To connect the FP0 I/O Link Unit and the FP0 Control Unit or FP0 Expansion
Unit, use an expansion connector. The FP0 I/O Link Unit functions as a buffer. The
output from the FP3/FP10SH is sent to the input of the FP0 through the FP0 I/O Link
Unit. The output from the FP0 is sent to the input of the FP3/FP10SH from the FP0 I/O
Link Unit. Be sure to connect the FP0 I/O Link Unit with one FP3/FP10SH Master Unit.
Without a master station, the slave station (including FP0 I/O Link Unit) will not work.
FP3/FP10SH
Master Unit
I/O
Link
Unit
I/O
Link
Unit
Serial connection
(two–conductor cable)
FP0
FP0
5.4.3
FP0 Connections
Power
supply
FP0
Control Unit
FP0
I/O Link Unit
FP0
I/O Link Unit
Communication line (RS485)
to the Master Unit or another
slave station
To connect the FP0 I/O Link Unit to the FP0, add an expansion unit to the main (or
another) unit. Three FP0 I/O Link Units can be connected to one FP0 Control Unit.
FP0
Control Unit
FP0
Control Unit
FP0
I/O Link Unit
FP0
I/O Link Unit
FP0
I/O Link Unit
FP0
I/O Link Unit
one–unit
expansion:
three–unit
expansion:
WX2,3,WY2,3
WX4,5,WY4,5
WX6,7,WY6,7
WX2,3,WY2,3
Summary of Contents for FP Series
Page 12: ...Chapter 1 Overview...
Page 21: ...FP0 Hardware Overview 1 10 Matsushita Electric Works Europe AG...
Page 22: ...Chapter 2 Control Units...
Page 44: ...Chapter 3 Expansion I O Units...
Page 67: ...FP0 Hardware Expansion I O Units 3 24 Matsushita Electric Works Europe AG...
Page 68: ...Chapter 4 Analog I O Unit...
Page 87: ...FP0 Hardware Analog I O Unit 4 20 Matsushita Electric Works Europe AG...
Page 88: ...Chapter 5 FP0 I O Link Unit MEWNET F...
Page 102: ...Chapter 6 Power Supply Unit...
Page 105: ...FP0 Hardware Power Supply Unit 6 4 Matsushita Electric Works Europe AG...
Page 106: ...Chapter 7 I O Allocation...
Page 112: ...Chapter 8 Installation...
Page 122: ...Chapter 9 Wiring...
Page 139: ...FP0 Hardware Wiring 9 18 Matsushita Electric Works Europe AG...
Page 140: ...Chapter 10 Trial Operation...
Page 143: ...FP0 Hardware Trial Operation 10 4 Matsushita Electric Works Europe AG...
Page 144: ...Chapter 11 Self Diagnostic and Troubleshooting...
Page 156: ...Appendix A System Registers...
Page 170: ...Appendix B Special Internal Relays...
Page 174: ...Appendix C Special Data Registers...
Page 183: ...FP0 Hardware Special Data Registers C 10 Matsushita Electric Works Europe AG...
Page 184: ...Appendix D Dimensions...
Page 195: ...FP0 Hardware Dimensions D 12 Matsushita Electric Works Europe AG...