ATTENTION:
After maintenance the safety protection guard installment must fix it on the power
tiller wholly
Ⅱ. Installation and Adjustment for cable
1.
Adjustment of the clutch cable. (See Figure 5 and 6)
①
Unscrew the locknut of the tie rod
②
Spin the tie rod clockwise until the exposed handle support is the shortest.
③
Get the joint of cable into the clutch wire socket of rear part of the gear-box
assembly, and ensure the joint of cable goes into the hole of the socket.
Figure 5
Figure 6
④
Get the wire into the M8 hole on base of the clutch fork arm, properly press