3D TRASAR
5500 - Installation & Operation Manual
521-OM0108.88
Copyright
2009 Nalco Company
Technical Help
(630) 305-CHEM
F-6
3D TRASAR Starter pH Upgrade Procedure
1. Order Upgrade
Order the 3D TRASAR Starter pH Upgrade,
P/N 060-TR3211.88
(includes pH probe, cable and
installation instructions.) Order through Nalco customer service, or through the Order Wizard.
2. Install New Hardware
Install the pH probe as follows:
STEP 1
-
Carefully unpack the pH probe.
STEP 2
-
Apply 5 revolutions of Teflon tape
to the pH probe threads.
STEP 3
-
Hand tighten the probe in the
threaded tee location indicated in
drawing at right.
STEP 4
-
Connect pH probe to pH cable
(cable is labeled pH.)
STEP 5 -
With power off, wire pH cable to
proper terminals in controller box
(see drawing below.)
STEP 6
-
Reconfigure the controller for pH.