3D TRASAR
5500 - Installation & Operation Manual
521-OM0108.88
Copyright
2009 Nalco Company
H-2
Technical Help
(630) 305-CHEM
Analog output 1 is pre-wired (jumpered) to Analog input 1 for the purpose of monitoring and
logging flow cell fouling data (every 15 minutes.)
2.
Fluorometer Installation
The fluorometer is shipped unattached to prevent damage. Follow installation instructions from sec-
tion 2.6.1 in the manual with the following exception: a t-fitting is installed on the outlet side of the
Fluorometer, instead of a flowswitch.
3.
Wiring
A junction box is not available with any of the 3D TRASAR models for High Fouling Applications.
Controller Box Layout
Relay 5 is pre-wired with a power cable for connection to the peristaltic pump andsolenoid valve
(used with the fluorometer cleaning system.)