3D TRASAR
5500 - Installation & Operation Manual
521-OM0108.88
Copyright
2009 Nalco Company
2-25
Technical Help
(630) 305-CHEM
2.6
STEP 6 – Install Probes
The table below indicates the types of probes included
with the 3D TRASAR Starter and 3D TRASAR systems.
IMPORTANT:
Corrosion Probe #1 must be mild
steel if mild steel is one of the two metallurgies.
Refer to the chart below for the order of optimal
corrosion probe locations.
!
Install probes
Install probes and attach
connectors as shown.
Tighten swage fitting fully.
ORP Probe
Install probes
Install probes and attach
connectors.
Corrosion Probe #1
Corrosion Probe #2
pH Probe
ORP Probe
Fluorometer
Conductivity Probe
WARNING
: Always turn off power before making any electrical connections, which in-
cludes all interconnecting cables, otherwise permanent damage may occur to system
components.
!
Refer to the drawing on
the left for the installa-
tion location of each
probe.
3D TRASAR
Starter
3D TRASAR
3D TRASAR Starter
Fluorometer
Included
N/A
3D TRASAR 6 channel
Fluorometer
Upgrade
Included
Conductivity
Included
Included
pH
Upgrade
Included
ORP
Upgrade
Included
Corrosion NCM100
Upgrade
Included
Probe #1
Probe #2
Mi
ld Ste
el
Galv S
teel
Alu
minu
m
Cu/Ni
Adm Brass
Cop
per