Assembly
1. For ceiling assembly, drill the appropriate holes and insert the dowel according to their size and distance.
2. Product should be suspended and fixed as shown in figure.
3. Make sure to install according to the direction of air flow.
4. Air ducts should be connected to flanges as shown in figure which are isolated with sealing sponge tape between product
and air duct.
5. Make sure that the power cord is connected correctly by looking at the electrical diagram. Device mounted on an all pole
circuit breaker, connect the splitter.
6. Perform trial operation of the fan, check if there are any errors in the product and vibrations.
Wiring diagram
Single-phase connection
DV-SQ
DUCT
SEALING TAPE
MAINTENANCE COVER
AIR DIRECTION
WALL
M
N
L
Brown
Black
Blue
Yellow-Green
C
~
3
ALNOR® ventilation systems
is a legally protected trademark and technical patent. All rights reserved.
w
w
w
.ve
nt
ila
tio
n-a
ln
or.
co
.u
k
Manual - Duct fans
DV-SQ