- 15 -
Step 9
Screw
Top cover(optional)
step by step as drawing.
Step 10
1.connect the I/O control board with Top cover.
2.Now connect plugs as shown in drawing.
Assembly parts
Top cover(optional)
Top cover(optional)
I/O control Board
Top cover
Insert position
P.35 NO.28 screw (M5×38)×4
P.35 NO.29 Nut(M5)×4
Summary of Contents for PAC-MAN BASKET
Page 1: ......
Page 36: ...36 VIII Wires Layout Basketball Wire diagram...
Page 37: ...37...
Page 45: ...45...