79
S08
MAINTENANCE
FITTING THE CHARGE AIR
COOLER
1. Fit the charge air cooler. Tighten the 4 screws to 50
Nm (37 lb-ft):
2. Carefully fit the charge air pipe from the lefthand tur
-
bocharger and tighten the V-clamp to 20 Nm (15 lb-ft).
3. Fit the charge air pipe from the right-hand turbo-
charger. Fit the V-clamp first and then the screw on the
bracket.
4. Fit the sea water pipe from the sea water pump, first to
the charge air cooler (the inner pipe) and then from the
charge air cooler to the heat exchanger (the outer pipe).
5. Fit the charge air pipe and the hose clamps:
6. Fit the crankcase ventilation hose:
7. Fit the catwalk:
– Loosely fit the protective plate to the charge air pipe.
Tighten the screws later.
– Fit the protective casing. Tighten the screws later.
– Fit the catwalk with screws.
– Tighten all screws. The protective plate and protective
casing must be tightened to a tightening torque of 15
Nm (11 lb-ft).
Summary of Contents for N16.1000 CR3
Page 2: ......
Page 4: ......
Page 34: ...34 S05 COMPONENTS ENGINE VIEWS N16 CR3...
Page 35: ...35 NOTES...
Page 48: ...48 S06 INSTRUMENTATION SYSTEM LAYOUT INCLUDING OPTIONS...
Page 118: ......