15
Zetasinter System
®
②
Install the heat shields.
③
Carefully insert the tube into the furnace, keep it straight to avoid breaking the heating elements. Keep
an equal length of tube at both ends of the furnace.
④
Install the tube holders.
Wrap the threads with PTFE tape and connect the pressure gauge and intake valves to the flanges:
The installation of the sealing flanges is shown in the figure below:
Right: Inlet flange (OD 6mm connection to the gas
supply)
Left: Outlet flange (OD 10mm connection to the vacuum
pump or to the bubbler)