NAPCO StarLink Fire: Getting Started Guide
35
333 Bayview Avenue, Amityville, New York 11701
For Sales and Repairs, (800) 645-9445
For Technical Service, (800) 645-9440 or visit us at
http://tech.napcosecurity.com/
(Note: Technical Service is for security professionals only)
Publicly traded on NASDAQ Symbol: NSSC
© NAPCO 2017
The NAPCO
SLE-CDMAI-FIRE
/
SLE-GSMI-FIRE
and
SLECDMAI-CFB
/
SLE3/4GI-CFB
Dual Path Commercial Fire
communicators, fully compliant with the 2013 edition of NFPA 72, are approved as Dual Path fire alarm communicators.
The capability of indicating and communicating signal failures to the central station within 6 hours of an outage allows each
unit to replace two existing telephone lines.
Note:
The
SLE-CDMAI-FIRE
/
SLE-GSMI-FIRE
and
SLECDMAI-CFB
/
SLE3/4GI-CFB
may also be configured as Sole Path Fire communicators, fully compliant with the NFPA 72, 2013
edition.
The following testing guide is intended to assist with the AHJ inspection of a
SLE-CDMAI-FIRE
/
SLE-GSMI-FIRE
or
SLEC-
DMAI-CFB
/
SLE3/4GI-CFB
Fire radio installation. All required testing procedures are described, followed by the
correct system responses. Ensure that in cases where a radio trouble output is connected to an input on the FACP, the fire
control panel properly annunciates the trouble condition.
Normal LED Indications
With the unit in standby mode, ensure the LEDs display as follows:
AC Failure Test
No Battery / Low Battery Test
The
SLE-CDMAI-FIRE
/
SLE-GSMI-FIRE
and
SLECDMAI-CFB
/
SLE3/4GI-CFB
models are powered directly from
the FACP power supply; radio AC Failure and Battery Failure tests are not required.
Signal Loss Test
This test ensures that the
SLE-CDMAI-FIRE
/
SLE-GSMI-FIRE
or
SLECDMAI-CFB
/
SLE3/4GI-CFB
will indicate a
supervisory trouble condition to the FACP and central station upon loss of signal within the required time.
Remove the antenna and observe the following indications:
(continued)
WI2263LF 9/17
StarLink
™
SLE-CDMAI-FIRE / SLE-GSMI-FIRE
& SLECDMAI-CFB / SLE3/4GI-CFB
Dual Path Fire Communicators
NFPA 2013 AHJ Inspection Guide
LED
Verify this Condition
Passed?
Yellow Operational LED
DS15
1 Slow Blink (indicates normal operation).
Green IP Network LED
DS14
1 Blink (Static IP) or 2 Blinks (DHCP).
Red IP Trouble LED
DS16
OFF (indicates no trouble present).
Yellow Operational LED
D4
Blinks every 10 seconds (indicates normal operation).
Green RF Signal LED
D3
Blinks at least 4 times (indicates minimally acceptable signal strength).
Red Trouble LED
D5
OFF (indicates no trouble present).
LED
Verify this Condition
Passed?
Red Trouble LED
D5
Blinks 5 times.
Trouble Relay Output on
PGM1 Trouble Output
Activates within 6 hours; check for proper trouble annunciation at
FACP
Supervisory signal
E788 (zone 1)
will be received by the central station
within 6 hours of the antenna being removed.
Summary of Contents for StarLink Connect Series
Page 2: ...2 NAPCO StarLink Fire Getting Started Guide...
Page 4: ...4 NAPCO StarLink Fire Getting Started Guide...
Page 5: ...NAPCO StarLink Fire Getting Started Guide 5...
Page 6: ...6 NAPCO StarLink Fire Getting Started Guide...
Page 7: ...NAPCO StarLink Fire Getting Started Guide 7...
Page 8: ...8 NAPCO StarLink Fire Getting Started Guide...
Page 12: ...12 NAPCO StarLink Fire Getting Started Guide...
Page 26: ...26 NAPCO StarLink Fire Getting Started Guide...
Page 30: ...30 NAPCO StarLink Fire Getting Started Guide...
Page 34: ...34 NAPCO StarLink Fire Getting Started Guide...