W415-2159 / D / 11.24.17
23
IOM
H14.1B
Caulk all cracks, seams or joints within a 6 foot (1.8m) radius of the termination.
Do not terminate under a deck unless there is adequate clearance to prevent damage from the
fl
ue gases.
A termination may be located at the end of a patio deck. Piping running beneath the deck must be suitably
insulated and suspended in a manner to prevent condensate from collecting and freezing.
Do not locate the terminal on the side of the building facing the prevailing winter winds.
H14.2A
In addition to the general guidelines, in Canada, the vent exhaust shall not terminate:
• Directly above a paved sidewalk or paved driveway which is located between two single-family dwellings
and serves both dwellings;
• Less than 7 feet (2.1m) above a paved sidewalk or paved driveway located on public property;
• Within 6 feet (1.8m) of a mechanical air supply inlet to any building;
• Above a meter/regulator assembly within 3 feet (.91m) horizontally of the center line of the regulator;
• Within 3 feet (.91m) of any service regulator vent outlet;
• Less than 12” (305mm) above grade level or anticipated snow level;
• Within 12” (305mm) of any door, window, or non-mechanical air supply inlet to any building;
• Within 12” (305mm) of the combustion air inlet of any other appliance;
• Underneath a veranda, porch or deck, unless (a) the veranda, porch or deck is fully open on a minimum
of two sides beneath the
fl
oor, and (b) the distance between the top of the vent termination and the
underside of the veranda, porch or deck is greater than 12” (305mm).
H14.3
In addition to the general guidelines, in the United States, the vent exhaust shall be installed in accordance
with the following:
•
The clearance from the bottom of the terminal to grade shall be 12” (305mm).
•
The vent shall not terminate over public walkways or over an area where condensate or vapor could
create a nuisance or hazard.
•
The vent terminal shall be installed 4 feet (1.2m) below, 4 feet (1.2m) horizontally from, or 1 foot (305mm)
above any door, window, sof
fi
t, under eave vent or gravity air inlet to the building.
•
The vent terminal shall have a minimum horizontal clearance of 4 feet (1.2m) from electric meters, gas
meters, regulators and relief equipment.
•
Locate the vent terminal 3 feet (0.91m) above any forced air inlet located within 10 feet (3m). Any fresh air
or make-up air inlet, such as for a dryer or furnace area is considered a forced air inlet.
The vent terminal should be located no fewer than 3 feet (0.91m) from an inside corner formed by two exterior walls.
Recommended clearance from overhangs is a minimum of 1 foot (0.3m) vertically for each foot horizontally up
to 6 feet (1.8m).
H3.14
READ AND FOLLOW ALL INSTRUCTIONS IN THIS SECTION. FAILURE TO PROPERLY
VENT THIS FURNACE CAN CAUSE CARBON MONOXIDE POISONING OR AN EXPLOSION
OR FIRE RESULTING IN PROPERTY DAMAGE, PERSONAL INJURY OR LOSS OF LIFE.
WARNING
!
!
9.2 IN
CANADA
9.3 IN UNITED STATES
9.4 FURNACE VENTING INSTALLATIONS
Summary of Contents for 9600E E-STAR Series
Page 27: ...W415 2159 D 11 24 17 27 IOM FIGURE 14A DIRECT VENT TERMINAL CLEARANCES...
Page 28: ...W415 2159 D 11 24 17 28 IOM IOM FIGURE 14B NON DIRECT VENT TERMINAL CLEARANCES...
Page 57: ...W415 2159 D 11 24 17 57 IOM 23 0 SERVICE HISTORY 43 1...
Page 58: ...W415 2159 D 11 24 17 58 IOM IOM 24 0 NOTES 44 1...
Page 74: ...6 0 NOTES 44 1 W415 2159 D 11 24 17 UM 74...