W415-0616 / E / 10.08.08
3
Before installation, consult with the authority having jurisdiction (building department, fire department etc...) to
determine if there is the need to obtain a permit.
note: changes, other than editorial, are denoted by a vertical line in the margin.
9.2
bI-WEEklY (OR EvERY 10 bAGS OF PEllETS)
32
9.2.1
vACUUm FIREbOx
32
9.3
SEmI-ANNUAllY (OR EvERY TWO TONS OF PEllET)
32
9.3.1
vACUUm hOPPER
32
9.3.2
SOOT ANd FlY ASh FORmATION
33
9.3.3
ClEAN ThE vERTICAl ExhAUST dUCT
33
9.3.4
ClEAN ExhAUST hOUSING (INSERT ONlY)
33
9.3.5
ClEAN ThE ExhAUST blOWER
33
9.3.6
ChECk All SEAlS
34
9.3.7
ClEAN ThE vENT
34
9.4
IN ThE EvENT OF A jAmmEd AUGER
34
10.0
normal operatInG sounds
35
11.0
WIrInG dIaGram
36
12.0
replacements
37
12.1
COmmON REPlACEmENT PARTS
40
12.2
NPS40 REPlACEmENT PARTS
41
12.3
NPI40 REPlACEmENT PARTS
42
12.4
COmmON ACCESSORY PARTS
43
12.5
NPI40 ACCESSORY PARTS
43
13.0
troubleshootInG
44
14.0
servIce and maIntenance loG
47
15.0
notes
48
Summary of Contents for Auburn NPS40
Page 1: ...W415 0616 E 10 08 08 1 W415 0616 E 10 08 08 10 00 ...
Page 35: ...W415 0616 E 10 08 08 35 10 0 Normal operating sounds TP OPERATING SOUNDS_PELLET Figure 10 0 ...
Page 40: ...W415 0616 E 10 08 08 40 12 1 Common replacement parts ...
Page 42: ...W415 0616 E 10 08 08 42 69 28 38 70 41 40 53 54 75 71 69 72 12 3 Npi40 replacement parts ...
Page 48: ...W415 0616 E 10 08 08 48 NOTES 15 0 notes TP NOTES ...