2.3 bulkheads
A.
Connect the gas flex lines and the pilot line to the gas
bulkheads located under the valve access opening.
Be sure to match up the gas manifold marked with
a dot with the center bulkhead, also marked with a
dot. Care must be taken to ensure the pilot line isn’t
damaged and ensuring gas tight connections are
made.
B.
Connect the pilot electrode leads to the bulkhead. The
leads can only fit one way. You need to match the 1/4”
flag with the 1/4” bulkhead spade and the 3/16” flag
with the 3/16” spade.
C.
Ensure the 2 venturi tubes are over the orifices before
lighting.
D.
Check for gas leaks by brushing on a soap and water
solution.
Do not use open flame.
E.
After leak test has been performed re-install access panel with gasket (if removed).
VENTURI
TUBE
ORIFICE
GAS
BULKHEADS
PILOT
BULKHEADS
DOTS
PRIMARY
BURNER
PILOT
ELECTRODE
PILOT
ELECTRODE
LEADS
2.4 night light™ installation
The HD81-1 comes equipped with two “Night Lights™”. The lights have been pre-wired and are controlled from
the remote control.
In the event the lamps or lens need replacing, follow the instructions below:
A.
Shut off breaker at main power supply
B.
Remove the four screws that secure the lens frame to the firebox sides. This frame retains the glass lens.
C.
The lamp can now be accessed.
The lamp will pull straight out of the socket. Replace with Wolf Steel parts only, as lamp and lens are special “high
temperature” products. When re-installing, ensure integrity of gasket seal.
THE FIREBOX MUST BE SEALED.
Over tightening the screws could break the lens. “Light Leakage” from the holes in the housing lamp may be
observed. The holes in the lamp housing are necessary for ventilation and must not be covered.
GASKET
LENS
FRAME
COLOURED SIDE UP
JOINT
D’ÉTANCHÉITÉ
LENTILLE
CADRE
CÔTÉ COLORÉ
AU-DESSUS
NIGHT LIGHTS
Bulkhead covers need to be removed.
note:
Do not handle the lamp (bulb) with bare fingers, protect with a clean, dry cloth.
note:
The middle tube is the primary burner and
cannot be turned off. The outside burner can
be turned on and off with the remote. If this
is not the case, switch the flex lines.
note:
At this stage, we recommend performing
an operational check before finishing
installation.
note:
EN
W415-0808 / E / 05.11.18
3
installation