W415-1739 / C / 08.03.17
EN
18
finish framing - after appliance installation
single-sided recessed
Ref
LV38-1
LV50-2
LV62
LV74
K
39 15/16” (101.4cm)
39 15/16” (101.4cm)
39 15/16” (101.4cm)
39 15/16” (101.4cm)
E
20 1/8” (51.1cm)
20 1/8” (51.1cm)
20 1/8” (51.1cm)
20 1/8” (51.1cm)
F
53 13/16” (136.7cm)
65 13/16” (167.2cm)
77 13/16” (197.6cm)
89 13/16” (228.1cm)
J
Optional - Appliance does not need to be elevated above floor
L
73” (185.4cm)
73” (185.4cm)
91” (231.1cm)
91” (231.1cm)
Q*
2” min and 3” max
(Q x R)*
80 sq. in.
160 sq. in.
M**
3” (76mm)
3” (76mm)
3” (76mm)
3” (76mm)
* ONLY APPLICABLE TO OPTION 2 AND 3 - Opening
must
be centered in enclosure on appliance. Dimensions represent
finished sizes and where applicable should be adjusted to include finish material thickness.
** Can only be increased to 4” max by building a protrusion.
Insulation
Drywall
Ceiling
K
R
E
F
J
L
M
Q
minimum framing
Finish framing
must
be built after
appliance has been placed in its
final position and venting con-
nected.
This configuration also re-
quires recess area to use
non-combustible facing due to
close proximity to vent.
note:
!
WARNING
• Shaded components (finish framing)
must
be non-combustible materials.
Option 2 illustrated (appliance not shown)
Although the minimum enclo-
sure height for the LV series is
73”, some venting configurations
that require more vertical rise will
require a larger enclosure to pro-
vide minimum vertical clearance
between vent pipes and combus-
tibles.