19
W415-1371 / 09.15.14
EN
A.
Fasten the roof support to the roof using the screws provided. The
roof support is optional. In this case the venting is to be adequately
supported using either an alternate method suitable to the
authority having jurisdiction or the optional roof support.
B.
Stretch the inner
fl
ex pipe to the required length. Slip the
inner
fl
ex pipe a minimum of 2” (51mm) over the inner pipe
of the air terminal connector and secure with 6 #8 screws.
Seal using a heavy bead of high temperature sealant
W573-0007 (not supplied).
C.
Repeat using the outer
fl
ex pipe, using a heavy bead of
high temperature sealant W573-0002 (not supplied).
D.
Thread the air terminal connector / vent pipe assembly down
through the roof. The air terminal must be positioned vertically
and plumb. Attach the air terminal connector to the roof support,
ensuring that the top of the air terminal is 16” (406mm) above the
highest point that it penetrates the roof.
E.
Remove nails from the shingles, above and to the sides of the
air terminal connector. Place the
fl
ashing over the air terminal
connector leaving a min. 3/4” (19mm) of the air terminal connector
showing above the top of the
fl
ashing. Slide the
fl
ashing
underneath the sides and upper edge of the shingles. Ensure that
the air terminal connector is properly centred within the
fl
ashing,
giving a 3/4” (19mm) margin all around. Fasten to the roof.
Do not nail through the lower portion of the
fl
ashing. Make
weather-tight by sealing with caulking. Where possible, cover
the sides and top edges of the
fl
ashing with roo
fi
ng material.
F.
Aligning the seams of the terminal and air terminal connector,
place the terminal over the air terminal connector making
sure the vent pipe goes into the hole in the terminal. Secure
with the three screws provided.
G.
Apply a heavy bead of weatherproof caulking 2” (51mm)
above the
fl
ashing. Install the storm collar around the air
terminal and slide down to the caulking. Tighten to ensure
that a weather-tight seal between the air terminal and the
collar is achieved.
H.
If more vent pipe needs to be used to reach the
fi
replace see “HORIZONTAL AIR TERMINAL
INSTALLATION” section.
24.2A
STORM COLLAR
FLASHING
CAULKING
WEATHER
SEALANT
2” (51mm)
AIR INLET
BASE
ROOF SUPPORT
INNER FLEX PIPE
INNER PIPE
HIGH
TEMPERATURE
SEALANT
AIR
TERMINAL
CONNECTOR
OUTER FLEX PIPE
MAINTAIN A MINIMUM 2” (51mm) SPACE BETWEEN THE AIR INLET BASE AND THE STORM COLLAR.
!
WARNING
4.2.2 VERTICAL AIR TERMINAL INSTALLATION