40
Electric Heat Models
Components
• Strip Heaters
• High Limits
• Sequencers
• Contactors
• Blower Relay
• Time Delay
• CPE Control Board
Sequence of Operations - Electric Heat, Series A, B, C, D
Call for Heat – The thermostat sends a call for heat by energizing the “white” wire to the
sequencer. The sequencers thermo-disc heats and closes the circuit to the limit switch. If the
limit switch is closed the heat strips and blower relay will energize. (on 15KW models the sec-
ond sequencer will initiate in approximately 90 seconds)
Blower Operation – The sequencer completes the circuit to the blower relay which energizes
and powers the blower motor. The blower will operate until the sequencer contacts break, de-
energizing the blower relay.
Sequence of Operations - Electric Heat, Series U*1
Call for Heat – The thermostat sends a call for heat therefore energizing the “white” wire to the
1st contactor. The 2nd contactor (and 3rd if used) will be powered after an adjustable time entry
(factory set for 30 seconds) elapses.
Blower Operation – At the initial call for heat the blower will energize. The blower will run an
extended period after all the W's are de-energized.
Sequence of Operations - Electric Heat, Series U*2 (Control Board)
Call for Heat – When a call for heat is active sending power to the W1 and W2 heating terminals
on the control board, the board will begin to sequence the heating outputs to energize the heat
contactors. Once W1 is energized the board will sequence output W1A after a 3 second delay
and W1B after a 28 second delay. Once W2 is energized the board will sequence out W2 after a
45 second delay.
Blower Operation – Once W1, W2, or G is energized the fan will operate. Once de-energized the
fan will run for an additional 5 seconds.
Electric Furnace
Summary of Contents for CPG41838-U
Page 2: ...2...
Page 5: ...5 Unit Dimensions Original R22 with Gas Heat A B Series 43...
Page 6: ...6 Original R22 with Electric Heat A B Series Unit Dimensions...
Page 7: ...7 Unit Dimensions Original R410A with Gas Heat B C D E Series...
Page 8: ...8 Unit Dimensions Original R410A with Electric Heat B C D E Series...
Page 9: ...9 Unit Dimensions U Series R410A 80 Gas Heat...
Page 10: ...10 Unit Dimensions U Series R410A up to 95 Gas Heat...
Page 11: ...11 Unit Dimensions U Series R410A Electric Heat...
Page 19: ...19 Gas Furnace 3 Remove the 11 screws 4 Remove the front furnace baffle...
Page 46: ...46 Chassis Cooling Section...
Page 79: ...79...