16
Operation
INSTALLATION
In the event of any component parts being damaged, do not proceed with installation. Notify the manufacturer and reach an agreement on how
to proceed.
1. Pull the red knob on the right side of the dust collector to unlock the sliding system.
2.
Using the black handle, lift the machine to the operating height. The red knob will “click” and lock into place when the operating height is
reached.
CAUTION:
BeFORe INSTALLING THe DUST COLLeCTOR, CAReFULLY MAKe A SIGHT CHeCK TO PINPOINT ANY DAMAGe SUFFeReD
DURING TRANSPORT.
WARNING:
BeFORe TRANSPORTING, ALWAYS LOWeR THe MACHINe TO TRANSPORT MODe.
3.
To lower the machine to transport mode, pull the red knob and lower the machine using the black handle. The red knob will “click” and
lock into place when transport mode is reached.
4.
If movement becomes difficult, remove the side cover, loosen the screws and if necessary, put some grease on the sliding system.
402539_DL2000_RevJ
Summary of Contents for DL2000
Page 2: ......
Page 30: ...30 Parts Diagrams 402539_DL2000_RevJ...
Page 32: ...32 Parts Diagrams 402539_DL2000_RevJ...
Page 34: ...34 Parts Diagrams 402539_DL2000_RevJ...
Page 38: ......
Page 39: ......