FieldPoint
TM
1
FP-20xx Quick Start Guide
©
National Instruments Corporation
FP-20
xx FieldPoint Quick Start Guide
•
FP-20
xx LabVIEW RT controller
•
35 mm DIN rail
•
Two DIN rail locks (included)
•
Terminal base(s)
•
I/O module(s)
•
11–30 VDC power supply
•
Accessories: Ethernet cable,
flathead screwdriver
•
PC running Windows
•
National Instruments FieldPoint
Software CD
•
LabVIEW RT
Install the Network Module
Mount the module on a DIN rail.
A. Unlock rail clip.
1
What You Need
to Get Set Up
322759d.qxd 4/4/2003 4:58 PM Page 1