background image

2

FP-20xx Quick Start Guide

ni.com

B. Hook lip on back of module

onto top of DIN rail, press
down, and snap into place.

NOTE

Do not use spliced DIN rails. Use only a single DIN rail.

C. Slide module into position

and lock rail clip. 

322759d.qxd  4/4/2003  4:58 PM  Page 2

Summary of Contents for FELDPoint FP-2000

Page 1: ...rail Two DIN rail locks included Terminal base s I O module s 11 30 VDC power supply Accessories Ethernet cable flathead screwdriver PC running Windows National Instruments FieldPoint Software CD Lab...

Page 2: ...com B Hook lip on back of module onto top of DIN rail press down and snap into place NOTE Do not use spliced DIN rails Use only a single DIN rail C Slide module into position and lock rail clip 32275...

Page 3: ...nal Base s 2 CAUTION Terminal bases must be connected to the network module before applying power to the module Do not connect or disconnect terminal bases while power is applied to the network module...

Page 4: ...sure there are no gaps between terminal bases E You must install DIN rail locks at each end of the bank to ensure reliable connections between terminal bases and network module Two rail locks are incl...

Page 5: ...dules A Align slots on module with guide rails on base and press module onto base until terminal base latch locks module in place B Repeat for each I O module 3 CAUTION Cascading power defeats isolati...

Page 6: ...h module by connecting an external power supply to the VSUP and COM terminals Refer to the I O module operating instructions for power requirements detailed wiring diagrams and safe wiring practices 5...

Page 7: ...V 31 32 C V 1 3 2 C 17 18 Separate Power Supply Recommended Cascaded Power Reduces Isolation No External Power Required Power supply connected to VSUP and COM terminals CAUTION Cascading power defeat...

Page 8: ...off and the A B C and D LEDs come on the FP 20xx has been configured and LabVIEW RT is starting up If the LEDs do not follow this sequence refer to the FP 20xx User Manual troubleshooting appendix 7...

Page 9: ...other applications C Insert the National Instruments FieldPoint Software CD into the CD ROM drive of your computer D Follow the onscreen instructions to complete the installation 8 NOTE If the setup...

Page 10: ...ork topology Memory FP 2000 16 MB nonvolatile 16 MB DRAM FP 2010 32 MB nonvolatile 32 MB DRAM FP 2015 512 MB nonvolatile 32 MB DRAM For information about the memory used by the LabVIEW RT module and t...

Page 11: ...they must be installed in a suitable sealed enclosure Operating temperature 25 to 55 C Storage temperature 55 to 85 C Humidity 10 to 90 RH noncondensing Maximum altitude 2 000 m Pollution Degree 2 Sa...

Page 12: ...able European Directives as amended for CE Marking as follows Low Voltage Directive safety 73 23 EEC Electromagnetic Compatibility Directive EMC 89 336 EEC NOTE Refer to the Declaration of Conformity...

Page 13: ...13 FP 20xx Quick Start Guide National Instruments Corporation Mechanical Dimensions 109 5 mm 4 31 in 91 44 mm 3 60 in 107 19 mm 4 22 in 322759d qxd 4 4 2003 4 58 PM Page 13...

Page 14: ...taly 39 02 413091 Japan 81 3 5472 2970 Korea 82 02 3451 3400 Malaysia 603 9131 0918 Mexico 001 800 010 0793 Netherlands 31 0 348 433 466 New Zealand 64 09 914 0488 Norway 47 0 32 27 73 00 Poland 48 0...

Reviews: