7.
Click
Next
.
8.
In the
De-Embedding Resources
window, verify that the
Resource Name
and
Resource
Type
are correct for the reference antenna.
Figure 10. De-Embedding Resources Window
9.
In the
Option String
field, verify that the following string appears:
Interpolate=true,FilePath=
<antenna data XML file
path>
,PathName=VGain
, where
<antenna data XML file path>
is the location
of the reference antenna values XML file.
Note
If you do not have the XML file, contact the NI services personnel
contracted on your project. The calibration values are part of the reference
antenna calibration data and are accessible through the embedded QR code on
the antenna. The gain values are converted into an XML file that the software
can read.
10. To accept all calibration settings, click
Calibrate.
Note
Advanced System Calibration Settings
information about configuring advanced settings.
11. When the
Connect Power Meter Dialog
box appears, complete the following steps:
a)
Disconnect the 2.4 mm (m)-to-2.4 mm (m) cable from the reference antenna and
connect it to the power meter.
b)
Follow the onscreen prompts to connect the correct cables, then click
Continue
.
c)
When the calibration is complete, review the graphs and values to ensure the results
are as expected. Click
Accept Values
or repeat the calibration if necessary.
28
|
ni.com
|
mmWave OTA Validation Test Reference Architecture