background image

cRIO-9118

+5 V DC

500 mW maximum

+3.3 V DC

5,400 mW maximum

Total chassis power
consumption

5,900 mW maximum

Installing the Controller on the Chassis

Complete the following steps to install the controller on the chassis.
1.

Make sure that no power is connected to the controller or the chassis.

2.

Align the controller with the chassis.

3.

Slide the controller onto the controller slot on the chassis. Press firmly to ensure the
chassis connector and the controller connector are mated.

4.

Using a number 2 Phillips screwdriver, tighten the two captive screws on the front of the
controller to 1.3 N · m (11.5 lb · in.) of torque.

Installing C Series Modules

Verify that power is not connected to the I/O connector(s) on the C Series module.

Removing C Series Modules

Verify that power is not connected to the I/O connector(s) on the C Series module before you
remove a module from the chassis.

Product Certifications and Declarations

To obtain product certifications and the DoC for NI products, visit 

ni.com/product-

certifications

, search by model number, and click the appropriate link.

Worldwide Support and Services

NI corporate headquarters is located at 11500 North Mopac Expressway, Austin, Texas,
78759-3504, USA.

4

  | 

ni.com

  | 

cRIO-9111/9112/9113/9114/9116/9118

Reviews: