14 Phase
Matrix
PXI-1430B
RF Downconverter Module
Quick Start Guide
Figure 6
Example of Starting the Soft Front Panel Installation Wizard
3
Continue to the next screen.
Figure 7
Example of Selecting Destination Directory for Executables
4
Enter the destination directory for the PXI-1430B’s Soft Front Panel
executables or browse to a destination directory by selecting the
Browse
button.
5
Once the file path has been entered,
select
Next
to continue to the Software License Agreement.